My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2020
>
01-13-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 2:25:20 PM
Creation date
1/30/2020 2:25:16 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—JANUARY 13, 2020 4 <br /> Interim Public Works Director/City Engineer Blomstrom stated he understood the concerns <br /> regarding change orders. He explained change orders were almost always adding or changing a <br /> contract because of something that was discovered during construction. He indicated a rare <br /> exception was for density incentives for bituminous paving. He discussed the density <br /> specifications required by MnDOT and noted if a contractor was able to meet a certain density <br /> within its paving the contractor was eligible for an incentive. He reported the proposed Change <br /> Order would adjust the payment amount in order to pay the contractor for the City's portion of the <br /> density incentive. <br /> Councilmember Holden asked why the City had to pay for temporary facilities for MnDOT <br /> projects. <br /> Interim Public Works Director/City Engineer Blomstrom commented on the table he <br /> completed for the change orders noting a history of the change orders was provided for the City <br /> Council. He explained Change Order 3 related to the replacement of a City watermain. He noted <br /> the replacement of a City watermain and the necessary temporary facilities were the responsibility <br /> of the City and not MnDOT. <br /> Councilmember Holden encouraged staff not to minimize the percentage or expense of change <br /> orders because real money from the City was being spent. <br /> Interim Public Works Director/City Engineer Blomstrom explained he was not trying to <br /> minimize the amount being spent but rather was working to show the Council how the project was <br /> performing in terms of change orders compared to the original contract amount. <br /> MOTION: Councilmember Holmes moved and Councilmember McClung seconded a <br /> motion to approve Change Order No. 5 for the Trunk Highway 10 Watermain <br /> Improvement Project. The motion carried (5-0). <br /> C. Motion to Approve Payment No. 9 and Change Order Nos. 6 and 7— Sunram <br /> Construction—Old Snelling Trail and Watermain Improvement Project <br /> Councilmember Holmes expressed concern regarding change orders. She discussed Change <br /> Order 6 and asked why an additional 21 storm sewer catch basins were needed. <br /> Interim Public Works Director/City Engineer Blomstrom stated that while the project pre- <br /> dates him, the number of catch basins are determined based on the volume of runoff and grade of <br /> the roadway. He noted trench drains were originally planned for this project but after further <br /> considering the expense for trench drains, the project substituted storm sewer catch basins. He <br /> noted it was more work for the contractor to install curb while placing the 21 catch basins than the <br /> originally planned trench basins. <br /> Councilmember Holmes requested further information on Payment No. 9. She stated she <br /> understood there were problems with this project, but she did not want the City paying any more <br /> money than was necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.