My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-05-2020 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2020
>
02-05-2020 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:29:26 AM
Creation date
2/3/2020 9:28:04 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills <br />Planning Commission Meeting for February 5, 2020 <br />P:\Planning\Planning Cases\2019\19-021 - Brausen PUD Amendment <br />Page 3 of 5 <br />Plan Review <br />2. Design Standards – Section 1325.05 Subd. 8 <br />Building Materials –Flexibility Requested <br />For new development, redevelopment, or modifications in the B-2 District, at least 75 percent of <br />the exterior building materials shall be of brick masonry, tile masonry, natural stone (or synthetic <br />equivalent), decorative concrete plank, transparent glass or any combination thereof. <br />Flexibility in exterior building materials is requested to better incorporate the addition into the <br />existing repair garage structure. Based on the submitted revised elevations, approximately 48 <br />percent of the building exterior will be comprised of materials required by the Zoning Code. <br />The east and south sides of the proposed building are where the Applicant is proposing to use pre- <br />cast panels. The image above compares the approved and proposed east elevation. The Applicant <br />added windows to break up the east elevation per the Councils request and the proposed pre-cast <br />utilized patterns and colors to match the existing repair garage. The south side relatively stays the <br />same as the previously approved plans besides the utilization of pre-cast and the removal of EIFS.
The URL can be used to link to this page
Your browser does not support the video tag.