My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-18-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
02-18-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 12:35:35 PM
Creation date
2/14/2020 12:34:06 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br />DATE: February 18, 2020 <br /> <br />TO: Honorable Mayor and City Councilmembers <br />David Perrault, City Administrator <br /> <br />FROM: Todd Blomstrom, Public Works Director/City Engineer <br /> <br />SUBJECT: Karth Lake Pump and Control Cabinet <br /> <br />Budgeted Amount: Actual Amount: Funding Sources: <br /> $13,002.00 $13,002.00 KLID <br /> <br />Council Should Consider <br /> <br />City Council direction is requested regarding replacement of the Karth Lake pump and repairs to <br />the control cabinet based on a recommendation from the Karth Lake Improvement District <br />Board. <br /> <br />Background/Discussion <br /> <br />At the November 18, 2019 work session, the City Council discussed funding for replacement of <br />the outlet pump and repairs to the control cabinet for Karth Lake. The Council directed staff to <br />work with the Karth Lake Improvement District Board to consider a proposal for the <br />Improvement District to fund the cost of the replacement pump and repairs (or replacement) of <br />the associated control cabinet, and the City would address the failing retaining wall adjacent to <br />the control panel and management of the pump operations. <br /> <br />On December 11, 2019, the Karth Lake Improvement District Board discussed four options to <br />repair the pump and control cabinet based on price quotation information obtained by City staff <br />as described below. Detailed cost information is provided in Attachment A. <br /> <br /> Option 1: Replace Pump and Retrofit Existing Control Cabinet: $13,002.00 <br /> Option 2: Replace Pump and Relocate Existing Control Cabinet: $26,702.00 <br /> Option 3: Replace Pump and Control Cabinet at Existing Location: $27,880.00 <br /> Option 4: Replace Pump and Relocate a New Control Cabinet: $34,430.00 <br /> <br /> <br />ITEM – 1F <br /> <br /> <br /> MEMORANDUM <br />
The URL can be used to link to this page
Your browser does not support the video tag.