My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
April-May 2020
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2020-2029
>
2020
>
April-May 2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:40:22 PM
Creation date
4/27/2020 4:39:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City of Arden Hills has <br />identified a number of street <br />improvement projects for 2020 and <br />beyond, including the following: <br />2020 Street Maintenance Project <br />Each year, the city performs street <br />and trail preservation activities in <br />different parts of the city as part of <br />a long-term program. Pavement <br />preservation work for the 2020 <br />construction season will include <br />seal coating, crack sealing and <br />fog sealing within segments of <br />city streets and trails. For project <br />information, visit cityofardenhills. <br />org/roadconstruction and the 2020 <br />Street Maintenance Project for a <br />project map, details and updates. <br />Snelling Avenue North and <br />County Road E Improvements <br />The city is in the early stages of <br />planning and design for proposed <br />improvements to Snelling Avenue <br />North scheduled for construction in <br />2022. Project planning includes the <br />following components. <br />1. Reconstruction of Snelling <br />Avenue North extending <br />from Highway 51 through the <br />intersection with County Road <br />E. <br />2. Consideration of a single lane <br />roundabout at the intersection <br />of County Road E and Snelling <br />Avenue North in partnership <br />with Ramsey County. <br />3. Replacement of water main, <br />sanitary sewer and storm sewer <br />based on a condition assessment <br />currently underway. <br />A neighborhood meeting was <br />conducted last fall to share project <br />information and get feedback. An <br />environmental site assessment <br />is currently being conducted <br />along the project corridor. Soil <br />and groundwater samples will <br />be collected at 14 locations in <br />April 2020 to identify if potential <br />contaminants exist under the <br />roadway where water, sanitary <br />sewer and storm sewer utility <br />replacement may be necessary. <br />The environmental assessment is <br />scheduled to be completed in June. <br />Additional project design, cost <br />estimating, and public informational <br />efforts will resume in July. <br />Hazelnut Park Area Street <br />Improvements (2021) <br />The city is collecting data and <br />project planning for proposed street <br />and utility improvements within the <br />Hazelnut Park area anticipated for <br />the 2021 construction season. The <br />project includes the following street <br />segments. <br />• Glenpaul Avenue from New <br />Brighton Road to Cleveland <br />Avenue <br />• Edgewater Avenue from New <br />Brighton Road to the west end <br />of the cul-de-sac <br />• Jerrold Avenue from New <br />Brighton Road to the west end <br />of the cul-de-sac <br />• Prior Avenue from County Road <br />D to Jerrold Avenue <br />• Lake Valentine Road from <br />Snelling Avenue North to <br />Mounds View High School <br />(tentative) <br />City staff is determining the extent <br />of water main, sanitary sewer <br />and storm sewer replacement that <br />should be included in the project. A <br />letter describing the project scope, <br />process and schedule will be mailed <br />to property owners within the <br />project area in May. <br />2020 Street, Parking Lot and <br />Drainage Improvements <br />The design process is underway <br />for three smaller projects that were <br />packaged together for delivery as <br />listed below. <br />1. Installation of two new <br />pedestrian crosswalks with <br />raised medians along Hamline <br />Avenue, located near Wyncrest <br />Court and Indian Oaks Circle. <br />2. Installation of drainage <br />improvements along the north <br />portion of Shorewood Drive to <br />resolve local flooding issues. <br />3. Replacement of deteriorated <br />parking lot pavement at the City <br />Hall site. <br />The project consultant has <br />completed design work for the <br />pedestrian crosswalks and field <br />survey work for the parking lot <br />and drainage improvements. <br />Construction plans are being <br />prepared for review by the <br />City Council at an upcoming <br />work session. Project bidding <br />is anticipated to occur in June. <br />Additional information regarding <br />the construction schedule will be <br />available after receiving bids. <br />City Identifies Street Improvement Projects for 2020 and Beyond
The URL can be used to link to this page
Your browser does not support the video tag.