My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
04-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 12:15:35 AM
Creation date
4/27/2020 5:33:13 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION—April 15, 2020 3 <br /> 3. Installation of perimeter fencing along the southwest portion of the parking lot upon <br /> completing the relocation of the west parking lot entrance noted above. Proposed fencing <br /> shall be four(4)tall decorative fencing. <br /> 4. Installation of a centralized traffic signal controlled pedestrian crossing at the location <br /> generally depicted on Figure 8 in the study report. <br /> 5. Installation of a small raised median and pedestrian refuge adjacent to the signal <br /> controlled pedestrian crossing as determined by the City Engineer during design of the <br /> signal. <br /> 6. Installation of sidewalk on the south side of Lake Valentine Road to route pedestrians <br /> from the signal controlled pedestrian crossing to the front entrance of the school building. <br /> 7. Installation of an additional street light at the signal controlled pedestrian crossing, in <br /> addition to the street lights previously installed at the east and west parking lot entrances. <br /> 8. Installation of School Zone Speed Limit signage as previously authorized by the City <br /> Council. 9. Installation of a 150-ft long exclusive right turn lane for eastbound Lake <br /> Valentine Road at the pick-up/drop-off access (south side of street). <br /> 10. Installation of a 150-ft long exclusive right turn lane for westbound Lake Valentine Road <br /> at the east parking lot access (north side of street). <br /> 11. Installation of sidewalk along the north side of Lake Valentine Road between the east <br /> parking lot entrance and Janet Court. <br /> 12. Installation of a 2-inch mill and overlay along Lake Valentine Road between the <br /> construction limits of right turn lane construction (99 and 410 above) to repair the <br /> existing pavement as a result of improvements noted above and utility crossings <br /> associated with the site improvements, as well as accommodating new pavement and <br /> crosswalk markings. <br /> Community Development Manager/City Planner Mrosla reviewed the options available to <br /> the Planning Commission on this matter: <br /> 1. Recommend Approval with Conditions <br /> 2. Recommend Approval as Submitted <br /> 3. Recommend Denial <br /> 4. Table <br /> Chair Gehrig opened the floor to Commissioner comments. <br /> Commissioner Lambeth asked if the school speed zone signage would be installed in the spring <br /> of 2020. <br /> Public Works Director/City Engineer Blomstrom reported the school has a plan in place for <br /> the speed zone signage and after receiving approval from the City the signage would be installed. <br /> He explained he did not have a specific date, but he anticipated installation would take place in <br /> the next six weeks. <br /> Commissioner Lambeth questioned if the school zone would be enacted during special events <br /> at the school. <br /> Public Works Director/City Engineer Blomstrom reported the school speed zone would be in <br /> effect "when children are present" per State Statute. He discussed how the school speed zone <br />
The URL can be used to link to this page
Your browser does not support the video tag.