My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
04-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 12:15:35 AM
Creation date
4/27/2020 5:33:13 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills - 2040 Comprehensive Plan <br /> neighborhood collector roads; however, it excludes parks, arterial roads, and the <br /> water infrastructure. <br /> 6.4.11 Staged Development <br /> Since the areas south of Highways 96 and 10 are considered fully developed and <br /> there is relatively little vacant property, a five year staged development has not <br /> been developed. While a small amount of vacant land exists in the developed <br /> portion of the City, development on the vacant land is unlikely to have a <br /> significant impact on the City's or region's infrastructure. However, the City has <br /> identified areas likely available for redevelopment or new development during the <br /> 2040 planning period (Figure 6.7). <br /> As previously noted in Chapter 5 the demolition and remediation of the TCAAP <br /> site was completed in November 2015. Grading of the site and the construction <br /> of the main roadway are expected to begin in 2019. At this time, it is expected <br /> that private development will begin in late 2019 or 2020. The project is <br /> anticipated to be completed in phases over the next 10 to 20 years; however, the <br /> development timeline will depend on a number of conditions, including the <br /> market, transportation improvements, and other related factors. <br /> The B2 Zoning District and the Gateway Business areas are anticipated to be <br /> developed/redeveloped by 2030. Additionally, the City anticipates a 7-acre <br /> Medium-Density zoned area bound by Interstate 694 to the south and Snelling to <br /> be redeveloped during this time period. Within 20 years the City anticipates <br /> redevelopment within the Red Fox/Grey Fox/Lexington Avenue Business Area <br /> Again, the specific timing is dependent on a number of factors, but Table 6.4 <br /> summarizes the anticipated redevelopment acreage in the city by decade. <br /> Table 6.4 —Areas of Possible Commercial and Industrial Redevelopment <br /> Approved: November 2019 <br /> 6-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.