Laserfiche WebLink
ATTACHMENT B <br /> Existing Infrastructure <br /> Jerrold Avenue <br /> The eastern 1,030 feet of Jerrold Avenue consists of deteriorated bituminous pavement with a condition <br /> rating below 20 out of 100. The street includes no curb and minimal storm sewer drainage. Existing water <br /> main consists of 6-inch diameter cast iron pipe installed in 1968. Sanitary sewer consists of 8-inch <br /> diameter VCP pipe installed in 1961 and lined in 2013. <br /> The western 480 feet of Jerrold Avenue consists of deteriorated pavement with a condition rating below <br /> 20 out of 100. The street includes concrete curb in relatively good condition and a storm sewer system. <br /> Existing water main consists of 6-inch diameter ductile iron pipe installed in 1977. Sanitary sewer consists <br /> of 8-inch diameter PVC pipe installed in 1977. <br /> Edgewater Avenue <br /> The eastern 1,200 feet of Edgewater Avenue consists of bituminous pavement with a condition rating of <br /> 54, although significant surface deterioration is occurring on this segment. Records indicate that <br /> Edgewater was last reconstructed in 1998. The street curb is generally in good condition and a system <br /> of storm sewer drainage inlets are located along the street segment. Existing water main consists of 6- <br /> inch diameter cast iron pipe installed in 1968. Sanitary sewer consists of 8-inch diameter VCP pipe <br /> installed in 1960 and lined in 2013. <br /> The western 600 feet of Edgewater Avenue consists of deteriorated bituminous pavement with a <br /> condition rating of 36. The street includes curb in generally good condition and a system of storm sewer <br /> drainage inlets. Existing water main consists of 6-inch diameter ductile iron pipe installed in 1977. <br /> Sanitary sewer consists of 8-inch diameter PVC pipe installed in 1977. The condition of existing 6-inch <br /> diameter sanitary force main will need to be evaluated to determine rehabilitation needs. <br /> Glenpaul Avenue <br /> Glenpaul Avenue from Cleveland Avenue to New Brighton Road consists of a deteriorated bituminous <br /> pavement with a condition rating of 21 or less. A majority of the roadway contains no curb or storm sewer <br /> drainage system. Existing water main consists of 6-inch diameter cast iron pipe installed in 1968. Sanitary <br /> sewer consists of 8-inch diameter VCP pipe installed in 1961 and lined in 2013. <br /> Prior Avenue <br /> Prior Avenue consists of bituminous pavement with a condition rating of 15. City records indicate that <br /> Prior Avenue was last overlaid in 1995. The street contains no curb or storm sewer with the exception of <br /> the intersection at Edgewater Avenue. Water main does not extend along Prior Avenue. Sanitary sewer <br /> consists of 21-inch diameter reinforced concrete pipe installed in 1961. This sanitary sewer segment has <br /> not been lined. <br /> Lake Valentine Road <br /> Lake Valentine Road from Snelling Avenue North to Interstate 1-35W was reconstructed in 1995 with new <br /> curb, storm sewer and pavement section. Water main consists of 6-inch diameter ductile iron pipe <br /> installed with the 1995 street improvements. Sanitary sewer consists of 8-inch diameter PVC pipe <br /> installed along the frontage of MVHS in 1995, and 8-inch VCP pipe from MVHS to Snelling Avenue North <br /> installed in 1960. The current pavement condition rating should be revised during the study. <br />