My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
04-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 12:15:35 AM
Creation date
4/27/2020 5:33:13 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Review shop drawing submittals, including concrete mix, storm sewer structures and pipes. <br /> C. Provide construction staking for project improvements. <br /> D. Provide on-site, part time construction observation (assume 10 hours). <br /> E. Prepare progress payments (assume 2) and change order documents. <br /> F. Material testing coordination. <br /> G. Prepare punch lists and provide final project inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.