My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
04-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 12:15:35 AM
Creation date
4/27/2020 5:33:13 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 28, 2020 <br /> Page 2 <br /> Valentine Road provides a through lane and a two-way left-turn lane (TWLTL) that shares <br /> storage with the eastbound left turning vehicles at the West Parking Access. The <br /> eastbound approach provides one shared through-right turn lane. The northbound <br /> approach provides one shared turn lane. Crosswalks are provided on the south and east <br /> legs of the intersection. <br /> • Lake Valentine Road &West Parking Access-This is a three-legged intersection with <br /> the southbound approach being stop controlled. The eastbound approach on Lake <br /> Valentine Road provides a through lane and a TWLTL that shares storage with the <br /> westbound left turning vehicles at the West School Access. The westbound approach <br /> provides one shared through-right turn lane. The southbound approach provides one <br /> shared turn lane. A crosswalk is provided on the west leg of the intersection (same <br /> crosswalk as the east leg at the West School Access). This intersection is situated <br /> immediately east of the West School Access intersection, so that the TWLTL can not be <br /> used by left turning vehicles at both accesses. <br /> • Lake Valentine Road & East Parking Access - This is a three-legged intersection (the <br /> fourth northbound unpaved leg is currently only used for construction vehicles, but will <br /> become the access to the handicapped parking facility)with the northbound and <br /> southbound approaches being stop controlled. The approaches on Lake Valentine Road <br /> each provide a left-turn lane (TWLTL) and a shared through-right turn lane. The parking <br /> lot approaches each provide one shared lane. A crosswalk is provided on the west leg of <br /> the intersection. <br /> • Lake Valentine Road & Bus Parking/Janet Court- This is a four-legged intersection <br /> with the northbound and southbound approaches being stop controlled. A two-way left- <br /> turn lane TWLTL is provided on the Lake Valentine Road approaches and shared <br /> through-right turn lanes. One shared lane is provided for the northbound and southbound <br /> approaches. A crosswalk is provided on the south leg of the intersection. <br /> • Lake Valentine Road & South Parking- This is a three-legged intersection with the <br /> northbound approach being stop controlled. A through lane and TWLTL are provided on <br /> Lake Valentine Road for both approaches as there are several driveways on the north <br /> side of the road. The northbound approach provides one shared lane and a median <br /> through the approach. No crosswalks are provided of the intersection as the sidewalk <br /> starts immediately west of this intersection. <br /> K:\014908-000\Traffic\Traffic Study\Lake Valentine Road Study.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.