My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
04-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2024 12:15:35 AM
Creation date
4/27/2020 5:33:13 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 28, 2020 <br /> Page 12 <br /> Table 1.Year 2020 Mid-Block Signal Only Operations Summary <br /> Intersection AM Peak PM Peak <br /> Movement Delay*(LOS) movement Delay*(LOS <br /> IRIIIIIIIIIII <br /> NB 10(B) 0(A) 7(A) 7(A) 0(A) 3(A) <br /> CL <br /> ,N West School Access& WB 5(A) 2(A) 0(A) 5(A) 3(A) 2(A) 0(A) 2(A) <br /> 2 Lake Valentine Rd SB <br /> r <br /> EB 0(A) 2(A) 1(A) 0(A) 1(A) 0(A) <br /> NB <br /> a <br /> Lake Valentine Rd&Ped WB 11(B) 10(B) <br /> 12 B 10 <br /> Crossing SB ( ) (B) <br /> n <br /> EB 12(B) 10(B) <br /> CL c WB 3(A) 1(A) 1(A) 0(A) <br /> ,% East Parking Access&Lake Valentine Rd SB 13(B) 0(A) 2(A) 7(A) 4(A) 3(A) <br /> r <br /> EB 5(A) 2(A) 3(A) 2(A) <br /> NB 12(B) 0(A) 4(A) 6(A) 4(A) 4(A) <br /> c Bus Parking Access/Janet WB 3(A) 0(A) 0(A) 2(A) 0(A) 0(A) <br /> Court&Lake Valentine 1(A) 1(A) <br /> Rd SB 5(A) 0(A) 4(A) 8(A) 5(A) 4(A) <br /> EB 3(A) 1(A) 1(A) 2(A) 1(A) 1(A) <br /> r NB 10(B) 3(A) 8(A) 4(A) <br /> ,% South Parking Access& WB 4(A) 1(A) 2(A) 3(A) I 1(A) 2(A) <br /> r <br /> Lake Valentine Rd <br /> � EB 1(A) 0(A) 1(A) 0(A) <br /> Delay measured in seconds per vehicle <br /> Year 2020 Mid-Block Signal and West Access Realignment Condition <br /> To represent the Year 2020 Mid-Block Signal and West Access Realignment Conditions, this <br /> scenario includes the mid-block signal as described previously and realignment of the West <br /> Parking Access to create a conventional intersection with the West School Access. The existing <br /> lane geometry, access, and traffic control at the remaining existing intersections was not <br /> modified. With the realignment of the West Parking Access, vehicles are now able to use this <br /> access without creating left-turn issues as can be shown in the existing condition. Organized <br /> queueing space will also be provided so vehicles aren't weaving through the parking lot to form a <br /> line when exiting the lot during the PM peak hour. The results of the 2020 Mid-Block Signal and <br /> West Access Realignment Condition traffic operations analysis are summarized in Table 2. Like <br /> the 2020 Mid-Block Signal Only Condition, the mid-block signal was modeled with a 45-second <br /> cycle length, giving 24 seconds to the pedestrian phase and 21 seconds to the vehicle phase. <br /> Figure 8 displays the 2020 Mid-Block Signal and West Access Realignment Traffic Volumes. <br /> Parking lot trips were redistributed based on their origin and destination. Trips coming from/going <br /> to the west on Lake Valentine Road were assigned to the West Parking Access and trips coming <br /> from/going to the east were assigned to the East Parking Access. This is expected to represent <br /> actual distribution because it will keep these drivers from driving through the mid-block signal <br /> where they would likely have to stop. As in the 2020 Mid-Block Signal, all pedestrians were <br /> relocated to the mid-block signal to cross Lake Valentine Road. As Table 2 shows the average <br /> delay for each peak hour, it is assumed that the peak 15-minute periods will experience slightly <br /> higher delays than shown. <br /> K:\014908-000\Traffic\Traffic Study\Lake Valentine Road Study.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.