Laserfiche WebLink
ATTACHMENT E - Lake Valentine Road <br />Project Name <br />Arden HIlls, Minnesota <br />Project Number <br />Item No. Item Unit Unit Price Est. Quantity Total Price <br />SEGMENT 100 <br />2531.618 TRUNCATED DOMES SQ FT 55.00 <br />2564.537 INSTALL SALVAGED SIGNS, TYPE "C"EACH 120.00 <br />2582.502 4" SOLID LINE - PAINT LIN FT 1.30 5,000.00 6,500.00 <br />2582.502 4" DOUBLE YELLOW - PAINT LIN FT 2.10 2,500.00 5,250.00 <br />2582.502 24" STOP LINE - PAINT LIN FT 12.20 <br />2582.502 24" STOP LINE - EPOXY LIN FT 16.20 <br />2582.503 ZEBRA CROSSWALK - PAINT SQ FT 6.60 <br />2582.503 ZEBRA CROSSWALK - EPOXY SQ FT 8.25 <br />SUBTOTAL - STREET IMPROVEMENTS 299,430$ <br />CONTINGENCY (37%)110,789$ <br />TOTAL - STREET IMPROVEMENTS 410,219$ <br />2104.501 REMOVE SEWER PIPE (SANITARY)LIN FT 6.55 <br />2104.501 REMOVE SANITARY SERVICE PIPE LIN FT 5.80 <br />2104.509 REMOVE MANHOLE EACH 725.00 <br />2104.523 SALVAGE CASTING EACH 105.00 <br />2503.601 TEMPORARY CONVEYANCE OF WASTEWATER LS --- <br />2105.602 DEWATERING - SANITARY SEWER EACH 85.00 <br />2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1,900.00 <br />2503.602 CONNECT TO EXISTING MANHOLE (SAN)EACH 1,595.00 <br />2503.602 8" x 4" PVC WYE, SCHEDULE 40 EACH 184.00 <br />2503.602 8" x 6" PVC WYE, SCHEDULE 40 EACH 248.50 <br />2503.603 8" PVC PIPE SEWER (SANITARY SDR 35)LIN FT 52.00 <br />2503.603 LINING SEWER PIPE 8" DIA LIN FT 25.00 2,750.00 68,750.00 <br />2503.603 4" PVC SANITARY SERVICE PIPE (SCH 40)LIN FT 37.00 <br />2503.603 6" PVC SANITARY SERVICE PIPE (SCH 40)LIN FT 40.00 <br />2506.522 ADJUST FRAME AND RING CASTING EACH 1,075.00 <br />2506.516 CASTING ASSEMBLY R-1733 (SELF SEAL LID)EACH 1,155.00 <br />2506.602 CONSTRUCT SANITARY SEWER MANHOLE EACH 4,100.00 <br />2506.603 CONSTRUCT SANITARY SEWER MH (EXTRA DEPTH)LIN FT 290.00 <br />2506.603 CONSTRUCT OUTSIDE DROP LIN FT 855.00 <br />2545.602 ADJUST HANDHOLE EACH 955.00 <br />SUBTOTAL - SANITARY SEWER 68,750$ <br />CONTINGENCY (30%)20,625$ <br />TOTAL - SANTIARY SEWER 89,375$ <br />OPINION OF PROBABLE COST - Lake Valentine Road <br />Total Project Assessment Assmt REU <br />Cost Amount Units Amount <br />Street Improvements $454,991 $227,496 35 $6,500 <br />Drainage Improvements $0 NOT FINAL <br />Sanitary Sewer Improvements $99,203 <br />Water Improvements $0 <br />TOTAL $554,194 <br />Preliminary, this is not a final assessment rate determination <br />SANITARY SEWER <br />Short Elliott Hendrickson Inc. Page 2 of 2