Laserfiche WebLink
<br /> <br /> <br />2004 Assessment Policy – Page 18 <br /> 7. Water Main Lateral Benefits <br /> <br />The benefit resulting to a property abutting or utilizing a water main where a <br />direct connection to that water main via a building service is reasonably <br />possible without additional lateral pipes. <br /> <br />Lateral benefit may be provided by connection to trunk, subtrunk or lateral <br />pipes. The calculation of lateral benefit from a trunk or subtrunk pipe will be <br />based on the cost of an eight inch (8") pipe along the same alignment for <br />commercial or industrial zoned property and a six inch (6") pipe for all other <br />areas. <br /> <br /> 8. Infrastructure Rehabilitation Projects <br /> <br />Any project or portion of a project that reconstructs an existing water system <br />facility. A rehabilitation project may occur on the existing alignment of the <br />water line or on a new alignment, thus allowing the existing line to be <br />abandoned or its status downgraded (i.e., trunk or subtrunk to lateral). <br /> <br /> <br />B. Determining Water Main Assessment Rates <br /> <br /> 1. Trunk, Subtrunk, Storage and Treatment Facility Rates <br /> <br />Any lateral and building service assessments described below will be <br />deducted from the total improvement cost to be assessed. The remaining costs <br />shall be spread equally to all properties that lie within the approved Service <br />District. The costs shall be spread on a gross area basis and will be known as <br />all or any of the following as appropriate: trunk, subtrunk, source, storage, and <br />treatment assessment. <br /> <br /> 2. Water Main Lateral Rates <br /> <br />The building service assessments described below will be deducted from the <br />total improvement cost to be assessed. The amount remaining after said <br />deductions will be assessed by the following method. <br /> <br />▪ R-1 and R-2 residential lots at 100% of the total project cost <br />▪ All other land uses at 100% of the total project cost <br /> <br /> <br /> 3. Water Main Building Service <br /> <br />The assessment rate for each size of building service three-quarter inch (3/4") <br />to eight inch (8") inch shall be determined by adding all the costs associated <br />with each size of service and dividing by the total number of services