Laserfiche WebLink
Ordinance 2011-009 <br /> D. Commission. The State Public Utilities Commission. <br /> E. Congested Right-of-Way. A crowded condition in the subsurface of <br /> the public right-of-way that occurs when the maximum lateral <br /> spacing between existing underground facilities does not allow for <br /> construction of new underground facilities without using hand <br /> digging to expose the existing lateral facilities in conformance with <br /> M.S. § 216D.04 (3), as amended from time to time, over a continuous <br /> length in excess of 500 feet. <br /> F. Construction Performance Bond. Any of the following forms of <br /> security provided at permittee's option: <br /> 1. Individual project bond; <br /> 2. Cash deposit; <br /> 3. Security of a form listed or approved under M.S. § 15.73 (3), as <br /> amended from time to time; <br /> 4. Letter of credit, in a form acceptable to the City; <br /> 5. Self-insurance, in a form acceptable to the City; or <br /> 6. A blanket bond for projects within the City, or other form of <br /> construction bond, for a time specified and in a form <br /> acceptable to the City. <br /> G. Degradation. A decrease in the useful life of the right-of-way caused <br /> by excavation in or disturbance of the right-of-way, resulting in the <br /> Page 2 of 15 <br />