My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:57:41 PM
Creation date
7/23/2020 3:55:09 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report Page 11 <br />2021 PMP Street and Utility Improvements <br />City Project Number PW 21-0100 <br />5. ESTIMATED COST AND FUNDING <br />5.1 Opinion of Cost <br />The opinion of probable cost for the project is provided in Table 4 and Table 5 below. <br />Alternative 1 includes full curb and gutter construction and Alternative 2 includes limited <br />curb and gutter construction as described in Section 3 of this report. The estimates includes <br />37% in overhead costs for street improvements and 30% overhead costs for utility <br />improvements. Overhead costs account for engineering, legal, financing, contingency and <br />administrative costs associated with the project. A detailed and itemized estimate is provided <br />in Appendix G. <br /> <br /> <br />Table 4 - Summary of Project Costs <br />Area 1 - Hazelnut Park Neighborhood <br /> Alternative 1 Alternative 2 <br />Improvement <br />Reclamation <br />Area Costs <br />Reconstruction <br />Area Cost <br />Reconstruction <br />Area Cost <br />Street Improvements - East Jerrold and Glenpaul - $1,297,157 $1,156,525 <br />Street Improvements - West Jerrold and Edgewater $346,170 - - <br />Street Improvements - Prior Avene - $369,296 $369,296 <br />Sanitary Sewer Improvements $18,675 $518,100 $518,100 <br />Water Main Improvements - $679,959 $679,959 <br />Storm Sewer Drainage Improvements - $577,162 $418,430 <br />Total Estimated Cost by Area $364,845 $3,441,674 $3,142,310 <br />GRAND TOTAL $3,806,519 $3,507,155 <br /> <br /> <br />Table 5 - Summary of Project Costs <br />Area 2 - Lake Valentine Road <br />Improvement <br />Estimated <br />Costs <br />Street Improvements - Lake Valentine Road $454,991 <br />Sanitary Sewer Improvements $99,203 <br />Total Estimated Cost $554,194 <br /> <br /> <br />The opinion of cost is based on recent construction projects of similar character and assumes <br />the construction of proposed improvements will begin in 2021. Actual costs will be <br />determined through competitive bids following final design for the project. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.