My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:57:41 PM
Creation date
7/23/2020 3:55:09 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report Page 16 <br />2021 PMP Street and Utility Improvements <br />City Project Number PW 21-0100 <br />7. CONCLUSIONS AND RECOMMENDATIONS <br />Based on the findings of this report, street and utility improvements consisting of removal of the <br />existing bituminous pavement, subgrade correction, addition of concrete curb and gutter, sanitary <br />sewer repairs, water main replacement, storm sewer expansion, and new bituminous pavement <br />are recommended along the following roadways: <br /> Jerrold Avenue between New Brighton Road to 335 feet west of Prior Avenue <br /> Glenpaul Avenue between New Brighton Road and Cleveland Avenue <br /> Prior Avenue between County Road D and 155 feet north of Jerrold Avenue (north <br />termini) <br /> <br />Street and utility improvements consisting of full depth reclamation, concrete curb repairs, <br />sanitary sewer service connection repairs, and storm sewer structure repairs are recommended <br />along the following roadways: <br /> Jerrold Avenue between 335 feet west of Prior Avenue to cul-de-sac (west termini) <br /> Edgewater Avenue between New Brighton Road and west cul-de-sac (west termini) <br /> <br />Street improvements for Area 2 consisting of Lake Valentine Road are recommended to be <br />rescheduled in the City’s Capital Improvement Program for the year 2028 due to the extent of <br />anticipated subgrade corrections and remaining service life of the pavement relative to other <br />street conditions within the City. The Public Works Department should complete milling and <br />patching repairs to the street at locations where transverse cracks are tenting as a mitigation <br />measure. Sanitary sewer lining should be scheduled with an upcoming sewer lining contract <br />prior to the year 2028. <br /> <br />The total estimated cost for the proposed 2021 Street and Utility Improvement Project as <br />recommended above is $3,806,519. Proposed funding for the project can be provided through a <br />combination of special assessments and City funds as outlined in Section 5 of this report. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.