My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:57:41 PM
Creation date
7/23/2020 3:55:09 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Todd Blomstrom, PE <br />May 6, 2020 <br />Page 4 <br /> <br /> <br />Table 1. Pavement core location and information. <br /> <br />Core ID Street <br />Bituminous <br />Depth <br />(inches) <br />Aggregate <br />Depth <br />(inches) <br />Recommended <br />Maintenance <br />Activity <br />Notes ³ <br />1 Jerrold <br />Avenue 6.5 3 ¹ <br />Full Depth <br />Reclamation <br />(FDR) <br />Core was in fair condition and <br />it started showing signs of <br />deterioration, losing fines and <br />binder. The top lift was 2.5 <br />inches. Subgrade material <br />was found to be sand with <br />clay. <br />2 <br />Edgewater <br />Avenue <br />4.25 7.75 ¹ <br />Core was in fair condition and <br />it started showing signs of <br />deterioration, losing fines and <br />binder. The top lift was 1.5 <br />inches. <br />3 4 8 ¹ <br />Core was in poor condition <br />showing delamination and <br />deterioration. The top lift was <br />1.5 inches. <br />4 4 8 ¹ <br />Core was in fair condition and <br />it started showing signs of <br />deterioration, losing fines and <br />binder. The top lift was 1.75 <br />inches. <br />5 5 8 ¹ <br />Core was in very poor <br />condition and it was <br />disintegrated. <br />6 6.75 7 ¹ <br />Core was in poor condition <br />showing delamination and <br />deterioration. The top lift was <br />1.5 inches. <br />7 <br />Lake <br />Valentine <br />Road <br />6 7 ² <br />FDR <br />All the cores were in good <br />condition with a top lift of 2 <br />inches. <br />8 5.25 7 ² <br />9 5.5 7 ² <br />10 5 9 ² <br />¹ Aggregate material was observed to be limestone along Jerrold Avenue and Edgewater Avenue. <br />² Aggregate material was observed to be recycled Class 5 along Lake Valentine Road. <br />³ Subgrade material was observed to be sand at all core locations (excluding Core 1).
The URL can be used to link to this page
Your browser does not support the video tag.