My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-27-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-27-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 3:57:41 PM
Creation date
7/23/2020 3:55:09 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />City of Arden Hills <br />1245 West Highway 96 ▪ Arden Hills Minnesota 55112 <br />Phone 651.634.5120 ▪ Fax 651.634.5137 <br />www.ci.arden-hills.mn.us <br /> <br />May 5, 2020 <br /> <br />Subject: 2021 Pavement Management Program <br /> <br /> <br />Dear Property Owner: <br /> <br />On April 27, 2020, the Arden Hills City Council authorized a feasibility study for potential street <br />and utility improvements in your neighborhood. The project is being considered for the 2021 <br />construction season. The study area includes Prior, Glenpaul, Edgewater and Jerrold Avenue as <br />well as the eastern portion of Lake Valentine Road as shown on the attached map. <br /> <br />The feasibility study will evaluate the extent and costs for replacement or repairs to street <br />pavement, water main, sanitary sewers and stormwater drainage infrastructure. During this <br />evaluation process, City staff requests that residents within the study area complete the enclosed <br />survey form to assist with determining needed improvements within your neighborhood. <br /> <br />Residents within the project area are encouraged to visit the City’s website to review additional <br />study information as described on the back of this page. Due to challenges related to COVID-19, <br />staff will be posting a recorded presentation describing project details by May 18, 2020 in lieu of <br />holding a public open house meeting. Residents can contact city engineering staff by email or <br />phone with any questions or comments related to potential street and utility improvements. <br /> <br />After completing the feasibility report, staff will mail you additional information describing the <br />schedule and future steps for recommended improvements within the 2021 Pavement <br />Management Program project area. <br /> <br />The City of Arden Hills would like to thank you in advance for your patience and cooperation <br />with this process. Please complete and return the enclosed survey form by June 3, 2020. If you <br />have any questions or comments, please contact David Swearingen at 651-792-7847 or email <br />dswearingen@cityofardenhills.org. <br /> <br /> <br />Sincerely, <br />CITY OF ARDEN HILLS <br /> <br /> <br /> <br />Todd Blomstrom, P.E. <br />Public Works Director / City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.