Laserfiche WebLink
AREA 1 - Hazelnut Park Neighborhood <br />Alternative No. 1 - Full Curb and Storm Sewer <br />2021 PMP - Neighborhood Portion of Project Only <br />Arden HIlls, Minnesota Assessment Costs Assessment Costs Prior Avenue <br />Project Number PW-21-0100 Edgewater and <br />West Jerrold <br />All Other Streets <br />(Glenpaul, E Jerrold) <br />Item No. Item Unit Unit Price Est. Quantity Total Price Total Price Total Price Total Price <br />Total Project <br />Residential Neighborhood <br />2571.502 REPLACE TREE 2-INCH B AND B TREE 585.00 15.00 8,775.00 $8,775 <br />2573.53 INLET PROTECTION - TYPE A EACH 128.00 30.00 3,840.00 $1,920 $1,920 <br />2123.604 TILL BOULEVARD SUBGRADE SQ YD 2.75 3,500.00 9,625.00 $9,625 <br />2574.525 TOPSOIL BORROW (LV)CU YD 28.40 1,700.00 48,280.00 $4,828 $38,624 4,828.00$ <br />2575.505 SODDING, TYPE LAWN SQ YD 3.90 3,500.00 13,650.00 $1,365 $10,238 2,047.50$ <br />2575.525 EROSION CONTROL BLANKET, CATEGORY 3 SQ YD 4.50 500.00 2,250.00 $2,250 <br />2575.535 POST WARRANTY SOD WATERING M GALS 15.25 30.00 457.50 $376 81.76$ <br />2575.601 EROSION CONTROL LS 1.00 5,000.00 5,000.00 $4,107 893.50$ <br />2575.605 HYDROSEEDING ACRE 6,180.00 1.00 6,180.00 $6,180 <br />SUBTOTAL - RESTORATION 98,058$ $8,113 $82,094 $7,851 <br />ENG. DESIGN, ADMIN, CONTINGENCY (30%)29,417$ $2,434 $24,628 $2,355 <br />TOTAL - RESTORATION 127,475$ $10,547 $106,722 $10,206 <br />RESTORATION <br />Page 4 of 4