Laserfiche WebLink
ARDEN HILLS CITY COUNCIL – JUNE 22, 2020 16 <br /> <br />parcels that total approximately 43 acres. The northern parcel which is 21.52 acres in size contains <br />the access road off of Pine Tree Drive and the majority of the surface parking. The center parcel <br />which is 19.16 acres in size contains an existing 181,432 square foot office building and a small <br />fraction of the surface parking. The remaining undeveloped parcel to the south is 2.43 acres in <br />size and is made up of mainly woodlands and wetlands. The Applicant is proposing to subdivide <br />the northern parcel into two (2) new lots and consolidate the center parcel and the remaining <br />southern exception parcel into one lot of record. <br /> <br />Community Development Manager/City Planner Mrosla commented it is important to note <br />that the current platting process is not associated with any specific development on the site. <br />However, the Lake Johanna Fire Department is in the due diligence process to acquire the lot <br />adjacent to Pine Tree Drive for a future fire station. This application only pertains to Bethel’s <br />request to divide the land and not future development projects. It was noted the Planning <br />Commission recommended approval of Planning Case 20-005 with 7-0 vote. A motion for <br />approval of Planning Case 20-005 for a Master Planned Unit Development and Preliminary <br />Plat/Final Plat at 2 Pine Tree Drive, based on the findings of fact and submitted plans, subject to <br />the following (16) conditions: <br /> <br />1. The project shall be completed in accordance with the plans submitted and as amended by <br />the conditions of approval. Any significant changes to the plans, as determined by the City <br />Planner, shall require review and approval by the City Council. <br />2. All conditions of the Master PUD and Preliminary Plat approval shall remain in full force <br />and effect. <br />3. The applicant shall record the Final Plat with Ramsey County and a copy shall be provided <br />to the City within sixty (90) days of the City’s approval. <br />4. A Development Agreement shall be prepared by the City Attorney and subject to City <br />Council approval. The Development Agreement shall be fully executed prior to release of <br />the Final Plat. <br />5. Survey monuments shall be placed and installed at all block corners, angle points, points <br />of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or steel <br />rods shall be placed at the corners of each lot. <br />6. The Developer Agreement shall identify maintenance responsibilities for Outlot A. Unless <br />specifically modified within the Development Agreement, all maintenance responsibilities <br />shall be completed by the property owner of Lot 3, Block 1. <br />7. All trails on Lot 3, Block 1 shall remain open to the public and terms of the agreement <br />shall be memorialized in the Developers Agreement. <br />8. Prior to the release of the Final plat, the property owner of Lot 1, Block 1 shall submit a <br />maintenance plan for the exiting trails on the subject parcel unless a written agreement <br />between the City and owner establishes a different requirement. <br />9. A 6-ft wide sidewalk shall be constructed along the realigned section of the private <br />driveway extending from Pine Tree Drive to Lot 3. <br />10. A 6-ft wide sidewalk shall be constructed along the west side of Pine Tree Drive from <br />Outlot A to the north boundary of “Exception Parcel C” upon development of Lot 2 or <br />relocation of the private driveway. <br />11. A traffic impact analysis shall be prepared in accordance with City standards and provided <br />to City staff for review prior to development of Lot 1 and Lot 2.