My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2020
>
06-22-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 4:49:35 PM
Creation date
7/28/2020 4:49:31 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL—JUNE 22, 2020 10 <br /> 7. Signage depicting the conservation easement boundaries shall be shown on grading plan, <br /> final location and sign design is subject to the approval of the Public Works Director. <br /> 8. A grading as-built and utility as-built plan shall be provided to the City upon completion <br /> of grading and utility work. <br /> 9. The proposed buildings shall conform to all other standards and regulations in the City <br /> Code. <br /> 10. The Applicant shall be financially responsible for all applicable water and sanitary <br /> charges. Rates applied shall be those in effect at the time of Final Plat approval and shall <br /> be memorialized in the Development Agreement. <br /> 11. Before construction, grading, or land clearing begins, trees or tree areas that are to be <br /> preserved shall be visibly marked and city-approved tree protection fencing or other <br /> method shall be installed and maintained at the critical root zones of the trees to be <br /> protected. The location of the fencing shall be in conformance with the approved tree <br /> preservation plan and approved by staff in writing. <br /> 12. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior <br /> to commencing any grading, land disturbance or utility activities. The Developer shall be <br /> responsible for obtaining any permits necessary from other agencies, including but not <br /> limited to MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT prior to <br /> the start of any site activities. <br /> 13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br /> infrastructure and components and any existing storm sewer from exposure to any and all <br /> stormwater runoff, sediments and debris during all construction activities. Temporary <br /> stormwater facilities shall be installed to protect the quality aspect of the proposed and <br /> existing stormwater facilities prior to and during construction activities. Maintenance of <br /> any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br /> 14. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br /> review and approve final grading and utility plans in writing. <br /> 15. Staff shall review and approve the final landscaping plan showing a minimum of three <br /> trees in the front yard per lot prior to the release of the Final Plat. <br /> 16. The Applicant shall be financially responsible for any cost incurred for undergrounding <br /> existing overhead electric utilities and other associated private utilities and within the <br /> development. <br /> 17. The Developer shall be wholly responsible for the removal of debris and fencing found <br /> onsite. <br /> 18. Prior to the release of the Final Plat, the Applicant shall execute the grant of permanent <br /> conservation easement and restrictive covenant for wetland and wetland buffer. A <br /> Development Agreement shall be prepared by the City Attorney and subject to City <br /> Council approval. The Development Agreement shall be fully executed prior to release of <br /> the Final Plat. <br /> Councilmember Holden asked if there was any additional footage to the north besides the <br /> proposed maintenance easement. <br /> Community Development Manager/City Planner Mrosla commented there is no additional <br /> room. He noted the 15 feet goes right up to the building pad. <br />
The URL can be used to link to this page
Your browser does not support the video tag.