My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-05-18 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2018
>
09-05-18 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2020 10:46:54 AM
Creation date
8/7/2020 10:46:51 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – September 5, 2018 3 <br /> <br /> <br />Brian Humphries, Associate Vice President of Facility Operations and Campus Planning at <br />Northwestern College, described the tip up panels that would be used and noted they would <br />match the current brick. He reported the panels would have a sandblasted finish to match the <br />entry way of the Totino Fine Arts Building. He was of the opinion the finished product the <br />addition would look just like the existing structure. <br /> <br />Commissioner Zimmerman asked if this addition would provide a second story or an expansion <br />to an existing building. <br /> <br />Greg Fenton, BWB Architects, reported the addition would be an expansion to an existing <br />building. He provided further comment on how the addition would be accessed through the main <br />building. <br /> <br />Commissioner Lambeth questioned if the proposed addition would encroach on any parking. <br /> <br />Mr. Fenton explained no parking on Constitution Way would be lost. <br /> <br />Chair Gehrig commented on the tree preservation/replacement plan and noted this information <br />was not included in the packet. He requested further information from staff on this matter. <br /> <br />Interim City Planner Conzemius reviewed the tree preservation and replacement plan with the <br />Commission. <br /> <br />Commissioner Jones asked if the Rice Creek Watershed would have to review this request. <br /> <br />Interim City Planner Conzemius stated a Rice Creek Watershed permit would be required for <br />this Site Plan. <br /> <br />Commissioner Lambeth requested the sidewalk slope be addressed by the applicant to ensure it <br />met all ADA and building codes. <br /> <br />Commissioner Vijums questioned if additional parking should be provided for this building <br />addition. <br /> <br />Interim City Planner Kansier explained the addition was consistent with the campus master <br />plan and therefore the existing parking was sufficient. <br /> <br />Chair Gehrig stated he supported the proposed addition and believed it was very well done. <br /> <br />Commissioner Jones requested two conditions for approval be added to this Planning Case. <br />The first would be to ensure the sidewalks meet all ADA requirements through the building <br />permit phase and the second would be to require the applicant to secure a Rice Creek Watershed <br />permit. <br /> <br />Commissioner Jones moved and Commissioner Lambeth seconded a motion to recommend <br />approval of Planning Case 18-016 for a Site Plan for the University of Northwestern based
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).