My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-033
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
2020-2029
>
2020
>
2020-033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2020 3:47:20 PM
Creation date
8/27/2020 3:47:18 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The applicant shall add a twelve (12) foot wide utility and drainage easements <br /> dedicated to the City along the right-of-way and centered on common lot lines per the <br /> City's subdivision regulations. <br /> 4. The applicant shall pay the required park dedication fee of$6,500 prior to issuance of <br /> a Grading and Erosion Control permit. <br /> 5. Monument stakes shall be installed to demarcate the property line between Parcel A <br /> and Parcel B. <br /> 6. A final Grading and Erosion Control Plan shall be reviewed and approved by <br /> engineering staff prior to the issuance of a Building Permit on Parcel B. <br /> 7. A Building Permit shall be required for the new dwelling on Parcel B. <br /> 8. A Grading and Erosion permit shall be obtained from the City's Engineering Division <br /> prior to commencing any grading,land disturbance or utility activities. <br /> 9. Prior to the issuance of a building permit,the Developer shall be financially <br /> responsible for 100 percent of all applicable sewer connection, sewer availability, <br /> water connection,water availability and Metropolitan Council Sac charges. <br /> 10. A Tree Preservation Plan shall be required as part of the Building Permit application <br /> for the new dwelling on Parcel B. <br /> 11. Any extension or relocation of City services for Parcel B shall subject to approval by <br /> the City Engineer and all associated costs shall be the responsibility of the applicant. <br /> 12. Should Shoreline Lane need to be extended due to proposed development of parcel B, <br /> the Applicant shall be financially responsible for 100 percent of the costs of the <br /> extension. <br /> ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS <br /> 24th DAY OF AUGUST,2020. <br /> David Grant, Mayor <br /> ATTEST: <br /> Ju Hanson, City Clerk <br /> To view the final document, access adopted Resolutions via Arden Hills Public Laserftche Weblink by visiting <br /> cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.