My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2020 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2020
>
07-08-2020 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 2:50:04 PM
Creation date
9/4/2020 2:49:09 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – June 3, 2020 9 <br /> <br />8. Prior to the release of the Final plat, the property owner of Lot 1, Block 1 shall submit a <br />maintenance plan for the exiting trails on the subject parcel unless a written agreement <br />between the City and owner establishes a different requirement. <br />9. A 6-ft wide sidewalk shall be constructed along the realigned section of the private <br />driveway extending from Pine Tree Drive to Lot 3. <br />10. A 6-ft wide sidewalk shall be constructed along the west side of Pine Tree Drive from <br />Outlot A to the north boundary of “Exception Parcel C” upon development of Lot 2 or <br />relocation of the private driveway. <br />11. A traffic impact analysis shall be prepared in accordance with City standards and <br />provided to City staff for review prior to development of Lot 1 and Lot 2. <br />12. Proposed extensions of water main and sanitary sewer constructed within Lot 1, Lot 2 and <br />Outlot A shall be private utility services. Public utility easements will not be required <br />over private water and sanitary sewer utilities within the site. The development agreement <br />shall include private access easements over these utilities to the benefit of the three lots. <br />13. The Applicant shall add a 20-ft wide public drainage and utility easement to the plat <br />extending along the north lot line for Lot 1, Block 1 and along the north lot line for Outlot <br />A. <br />14. The Applicant shall add a 20-ft wide public drainage and utility easement to the plat <br />extending along the south lot line for Lot 3, Block 1 between the east right-of-way line at <br />the terminus of Dunlap Street and the southwest corner of Lot 1. <br />15. The Applicant shall add a 10-ft wide public drainage and utility easement to the plat <br />extending along the north lot line for Lot 3, Block 1 between Outlot A and the west lot <br />line for Lot 3. <br />16. Prior to the issuance of a grading permit, all items identified in the May 27, 2020 <br />Engineering Division memo shall be addressed. All comments shall be adopted herein by <br />reference. <br /> <br />Community Development Manager/City Planner Mrosla reviewed the options available to <br />the Planning Commission on this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Gehrig opened the floor to Commissioner comments. <br /> <br />Commissioner Wicklund asked if staff discussed the 16 conditions with the applicant. <br /> <br />Community Development Manager/City Planner Mrosla reported staff had discussed the <br />conditions with the applicant. He explained the applicant supported the staff recommended <br />conditions. <br /> <br />Commissioner Wicklund stated he supported the request from Bethel University. <br /> <br />Commissioner Vijums discussed the trail system and asked if the existing trails would be <br />replaced after the new buildings were constructed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.