My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-08-2020 PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2020
>
07-08-2020 PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 2:50:04 PM
Creation date
9/4/2020 2:49:09 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS PLANNING COMMISSION – June 3, 2020 4 <br /> <br />12. A Grading and Erosion permit shall be obtained from the city’s Engineering Division <br />prior to commencing any grading, land disturbance or utility activities. The Developer <br />shall be responsible for obtaining any permits necessary from other agencies, including <br />but not limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT <br />prior to the start of any site activities. <br />13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />14. Prior to the issuance Grading and Erosion permit, the Engineering Department shall <br />review and approve final grading and utility plans in writing. <br />15. Staff shall review and approve the final landscaping plan showing a minimum of three <br />trees in the front yard per lot prior to the release of the Final Plat. <br />16. The Applicant shall be financially responsible for any cost incurred for undergrounding <br />existing overhead electric utilities and other associated private utilities and within the <br />development. <br />17. The Developer shall be wholly responsible for the removal of debris and fencing found <br />onsite. <br />18. Prior to the release of the Final Plat, the Applicant shall execute the grant of permanent <br />conservation easement and restrictive covenant for wetland and wetland buffer. A <br />Development Agreement shall be prepared by the City Attorney and subject to City <br />Council approval. The Development Agreement shall be fully executed prior to release of <br />the Final Plat. <br /> <br />Associate Planner Hartmann reviewed the options available to the Planning Commission on <br />this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted <br />3. Recommend Denial <br />4. Table <br /> <br />Chair Gehrig opened the floor to Commissioner comments. <br /> <br />Commissioner Jefferys asked if this project would come back to the Planning Commission <br />again. <br /> <br />Community Development Manager/City Planner Mrosla stated this would be the only time <br />this Planning Case comes before the Planning Commission. <br /> <br />Commissioner Jones questioned if the only request before the Commission was for narrower <br />lots. <br /> <br />Community Development Manager/City Planner Mrosla indicated the Variance request was <br />for narrower lots and noted the applicant was also requesting Preliminary Plat approval that
The URL can be used to link to this page
Your browser does not support the video tag.