My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-20-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 3:54:15 PM
Creation date
9/8/2020 3:50:35 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2021 2025 <br />thru Department Street Department <br /> Description <br />Street and utility improvements consisting of removal of the existing bituminous pavement, subgrade correction, addition of concrete curb and <br />gutter, sanitary sewer repairs, water main replacement, storm sewer expansion, and new bituminous pavement are recommended along the <br />following roadways: Jerrold Avenue between New Brighton Road to 335 feet west of Prior Avenue; Glenpaul Avenue between New Brighton <br />Road and Cleveland Avenue; Prior Avenue between County Road D and 155 feet north of Jerrold Avenue (north termini). <br />Street and utility improvements consisting of full depth reclamation, concrete curb repairs, sanitary sewer service connection repairs, and storm <br />sewer structure repairs are recommended along the following roadways: Jerrold Avenue between 335 feet west of Prior Avenue to cul-de-sac (west <br /> termini); and Edgewater Avenue between New Brighton Road and west cul-de-sac (west termini). <br />Project #21-Str-005 <br />Priority 2 Very Important <br /> Justification <br />Existing street pavement conditions are declining with Jerrold, Glenpaul and Prior below 20. Proposed improvements are necessary to continue <br />safe and reliable street and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated <br />street pavement within the City. Proposed water main improvements will provide for an orderly replacement of water distribution system assets as <br />the water system ages over time. <br /> Budget Impact/Other <br />Useful Life 30 <br />Project Name 2021 PMP - Hazelnut Neighborhood Category Streets: Reconstruction <br />Type Improvement <br />TCAAP No <br />Total Project Cost:$3,807,000 <br />Total2021 2022 2023 2024 2025Expenditures <br />3,632,0003,632,000Construction/Maintenance <br />3,632,000 3,632,000Total <br />Total2021 2022 2023 2024 2025Funding Sources <br />1,066,0001,066,000Capital Improvement Funds <br />(PIR) <br />822,000822,000Other <br />517,000517,000Sanitary Sewer Utility Fund <br />567,000567,000Surface Water Mgmt Utility <br />Funds <br />660,000660,000Water Utility Funds <br />3,632,000 3,632,000Total <br />Produced Using the Plan-It Capital Planning Software <br />20
The URL can be used to link to this page
Your browser does not support the video tag.