My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-20-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
07-20-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2020 3:54:15 PM
Creation date
9/8/2020 3:50:35 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2021 2025 <br />thru Department Street Department <br /> Description <br />Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous <br />pavement, repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs. Street segments include: Karth <br />Lake Dr (Pleasant Dr to Cul-de-Sac), Pleasant Drive (Amble to Karth Lake Dr), Pleasant Circle, Amble Drive (Karth Lake Dr to Lexington <br />Avenue), and Stowe Ave (New Brighton to Lake Johanna). <br />Project #24-Str-001 <br />Priority 2 Very Important <br /> Justification <br />Pavement conditions are showing distress with condition ratings from 33 to 59, with exception of one segment of Pleasant Dr. Pavement <br />conditions will continue to decline by 2024. Proposed improvements are necessary to continue safe and reliable street and utility services. These <br />improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement within the City. <br /> Budget Impact/Other <br />Useful Life 20-25 <br />Project Name Karth Lake East Neighborhood Streets and Stowe Ave Category Streets: Reconstruction <br />Type Improvement <br />TCAAP No <br />Total Project Cost:$1,357,500 <br />Total2021 2022 2023 2024 2025Expenditures <br />1,357,5001,357,500Construction/Maintenance <br />1,357,500 1,357,500Total <br />Total2021 2022 2023 2024 2025Funding Sources <br />650,000650,000Capital Improvement Funds <br />(PIR) <br />650,000650,000Other <br />7,5007,500Sanitary Sewer Utility Fund <br />30,00030,000Surface Water Mgmt Utility <br />Funds <br />20,00020,000Water Utility Funds <br />1,357,500 1,357,500Total <br />Produced Using the Plan-It Capital Planning Software <br />25
The URL can be used to link to this page
Your browser does not support the video tag.