Laserfiche WebLink
TotalSource Project # Priority 2021 2022 2023 2024 2025 <br />Water Utility Funds <br />21-Str-005 660,000660,0002021 PMP - Hazelnut Neighborhood 2 <br />21-Str-006 385,000385,000Lexington Improvements 2 <br />21-W-002 65,00065,000Trunk Water Main Evaluation 2 <br />22-Str-001 20,00020,000Arden Oaks Neighborhood Streets 2 <br />22-Str-003 25,00025,000Old Snelling Ave PMP, CR E - Hwy 51 2 <br />22-W-001 135,00075,000 60,000Water Tower Maintenance 2 <br />23-Str-001 20,00020,000Colleen/Norma/Briar Knoll/Royal Hills/Arden Vista 2 <br />24-Str-001 20,00020,000Karth Lake East Neighborhood Streets 2 <br />25-Str-001 20,00020,000Tiller/Dunlap/Benton Way Resurface/Replace 2 <br />25-W-002 90,00090,000Booster Station Improvements 2 <br />1,440,0001,110,000 120,000 20,000 80,000 110,000Water Utility Funds Total <br />15,723,1605,893,660 2,983,250 2,802,500 1,860,250 2,183,500GRAND TOTAL <br />Produced Using the Plan-It Capital Planning Software <br />49