Laserfiche WebLink
<br /> <br /> <br />Phase I Environmental Site Assessment <br />Old Snelling Avenue & County Road E Improvements <br />WSB Project No. 015447-000 Page 3 <br />2. Introduction <br /> <br />2.1 Purpose <br /> <br />WSB was retained by the City of Arden Hills (City) to conduct a Phase I Environmental Site <br />Assessment (ESA) for the proposed Old Snelling Avenue & County Road E Improvements project <br />located in Arden Hills, Minnesota (the Project Corridor). The objective of the assessment was to <br />identify Recognized Environmental Conditions (RECs) associated with the Project Corridor <br />according to ASTM E1527-13 “Standard Practice for Environmental Site Assessments: Phase I <br />Environmental Site Assessments”. <br /> <br />The ASTM E1527-13 Standard defines the term recognized environmental condition as meaning <br />“the presence or likely presence of any hazardous substances or petroleum products in, on, or at <br />a Project Corridor: (1) due to any release to the environment; (2) under conditions indicative of a <br />release to the environment; or (3) under conditions that pose a material threat of a future release <br />to the environment.” The term is not intended to include de minimis condition’s that generally do <br />not present a threat to human health or the environment and that generally would not be the <br />subject of an enforcement action if brought to the attention of appropriate governmental agencies. <br />Conditions determined to be de minimis are not recognized environmental conditions. <br /> <br />WSB understands that the City intends to utilize this assessment to determine the extent of <br />potential soil and/or groundwater contamination prior to proceeding with design of street and <br />utility improvements at the Project Corridor. Proposed street and/or utility improvements include <br />roadway reconstruction, a single lane roundabout, multiple-use trail, and storm sewer, sanitary <br />sewer, and water main replacements. It is understood that the work is planned during the 2022 <br />construction season. <br /> <br />2.2 Scope of Services <br /> <br />The Scope of Services performed by WSB is defined by the ASTM E1527-13 Standard and the <br />methodologies and procedures described in the body of this report. The ASTM E1527-13 <br />Standard is intended to permit a user to satisfy one of the requirements to qualify for the innocent <br />landowner, contiguous Project Corridor owner, or bona fide prospective purchaser limitations of <br />Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) liability, <br />which is the practice that constitutes “all appropriate inquiry into previous ownership and uses of <br />the Project Corridor with good commercial or customary practice” as defined in 42 U.S.C. 9601 <br />(35) (B). <br /> <br />2.3 Assessment Limitations and Assumptions <br /> <br />This Phase I ESA was performed in accordance with ASTM E1527-13 Standard Practice for <br />Environmental Site Assessments. Snow was present during the site visit which limited direct <br />ground observation. No conditions were encountered that were determined to be significantly <br />limiting to the purpose of this assessment. <br /> <br />The Scope of Services for this Phase I ESA did not include the completion of soil borings, the <br />installation of groundwater monitoring wells, or the collection of soil, sediment, surface water, <br />groundwater, or soil vapor samples. In addition, this assessment did not include collection or <br />analysis of samples for the presence of asbestos, polychlorinated biphenyls (PCBs), lead-based <br />paint, lead in drinking water, radon, or urea formaldehyde as this is beyond the scope of the <br />ASTM E1527-13. <br /> <br />2.4 Special Terms and Conditions <br /> <br />The findings and conclusions presented in this report are based on the general guidance <br />provided by ASTM E1527-13, available data cited in this report, and Project Corridor conditions <br />noted at the time of the site reconnaissance. A Phase I ESA cannot wholly eliminate the