Laserfiche WebLink
<br /> <br /> <br />Field Investigation Report <br />Old Snelling Avenue and County Road E Improvements <br />WSB Project No. R-015447-000 Page 9 <br /> <br />5. Recommendations <br /> <br />Based on the results of this Field Investigation, WSB provides the following recommendations: <br /> <br />· Prepare a Response Action Plan / Construction Contingency Plan (RAP/CCP) for the proposed <br />reconstruction of the Project Corridor. The RAP/CCP will ensure all encountered contamination <br />(documented and undocumented) is managed in accordance with local, state, and federal <br />regulations. <br /> <br />· Enroll the project into the MPCA’s Brownfield Program for eligible technical assistance and/or <br />liability assurances related to the PAH and DRO contamination present at the Project Corridor. <br />The RAP/CCP should be submitted to the MPCA for review and approval prior to the start of the <br />project. The MPCA charges $125 per hour for Brownfield Program services. <br /> <br />· An environmental professional should be onsite to oversee, screen, and document all excavation <br />and disturbances near known or suspected areas of contamination during reconstruction. This will <br />be a requirement of the MPCA approved RAP/CCP. <br /> <br /> <br /> <br />