My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-10-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:20:15 AM
Creation date
9/8/2020 4:14:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION III- COMPENSATION FOR SERVICES <br /> A. FEES. <br /> 1. The CLIENT will compensate the CONSULTANT in accordance with the following Schedule <br /> of Fees for the time spent in performance of Agreement services. Total cost of services for <br /> Tasks 1-8 shall not exceed$ 179,069 without the prior consent of CLIENT. Total estimated fee <br /> for construction phase services,Task 9,is an estimated hourly of$158.698 (1562 hours). The <br /> payment of additional Construction Services to the CONSULTANT will be made by the <br /> CLIENT and be paid monthly on an hourly basis at the rates specified.Hours,rates and fees for <br /> Project tasks are further described in Exhibit I. <br /> Schedule of Fees <br /> Employee <br /> Rates <br /> Senior Principal $150-280/Hour <br /> Principal Engineer/Surveyor/Planner/GIS/Landscape Architect $140-225 <br /> Senior Engineer/Surveyor/Planner/GIS/Landscape Architect $110-210 <br /> Project Manager(Inc. Survey, GIS, Landscape Architect) $100-195 <br /> Project Engineer/Surveyor/Planner/Landscape Architect $85-190 <br /> Design Engineer/Landscape Designer/Graduate Engineer/Surveyor $80-190 <br /> Specialist(Nat. Resources; GIS;Traffic; Graphics; Other) $60-175 <br /> Senior Technician (Inc. Construction, GIS,Survey') $85-180 <br /> Technician(Inc. Construction, GIS,Survey') $65-150 <br /> Administrative/Corporate Specialists $45-125 <br /> Structural/Electrical/Mechanical/Architect $120-150 <br /> 1 No separate charges will be made for GPS or robotic total stations on Bolton&Menk,Inc. survey <br /> assignments;the cost of this equipment is included in the rates for Survey Technicians. <br /> 2. The preceding Schedule of Fees shall apply for services provided through December 31,2020. <br /> Hourly rates may be adjusted by CONSULTANT,in consultation with CLIENT,on an annual <br /> basis thereafter to reflect reasonable changes in its operating costs. Adjusted rates will become <br /> effective on January 1 st of each subsequent year,upon written acceptance by CLIENT. <br /> Public Standard Form—MN Page 3 of 11 2019(20190712) <br />
The URL can be used to link to this page
Your browser does not support the video tag.