My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-10-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-10-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:20:15 AM
Creation date
9/8/2020 4:14:02 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Team <br /> 141 Sarah Lloyd, P.E. Nick Amatuccio, P.E. <br /> Project Manager Senior Project Engineer <br /> Sarah will serve as your primary point of contact.She has As the lead project engineer,Nick will work with the team <br /> the qualifications,experience,motivation,and work ethic to ensure the street and utility improvements are buildable <br /> to effectively manage and coordinate each project phase. and meet the necessary requirements. <br /> Sarah will provide close coordination with the City of Arden Hills and project A senior project engineer who joined Bolton&Menk <br /> partners.She will be responsible for overall team management and all schedule, in 2011,Nick is responsible for design and construction <br /> cost, public outreach,and scope management processes. administration and engineering for many municipal projects. <br /> Sarah collaborates with clients to come up with solutions His design experience includes preliminary layouts for <br /> and help them achieve their goals. She is a project feasibility reports;preparation of final plans, specifications, <br /> manager who began her engineering career in 1996.Her and cost estimates; and shop drawing review.Nick enjoys <br /> experience includes a variety of engineering tasks including working in the field with city staff, residents,business <br /> the preparation of preliminary engineering reports,final owners,and contractors to complete successful construction <br /> design,plan and specification production,cost estimating, projects, such as Mainstreet Improvements for the City <br /> and construction management. She works on a variety of of Hopkins—his favorite and most challenging project. <br /> municipal street and utility infrastructure projects including He currently focuses on the administration side of the <br /> new construction and reconstruction. Sarah enjoys talking to construction process and works closely with the inspectors <br /> residents and council members to help them better understand to ensure a smooth project. <br /> the various project elements and why improvements are <br /> necessary through informal and formal project meetings and Similar Project Experience <br /> presentations. She serves as a primary contact for multiple Interlachen Park Street and Utility Improvements,City of Hopkins <br /> cities and has managed all phases of municipal project 2019 Street and Utility Improvements,City of Hopkins <br /> development from conception through construction. Construction Support on Candlelight Terrace Street Reconstruction,City <br /> of Plymouth <br /> Similar Project Experience <br /> • 12111 Street and Pleasant Avenue,City of Burnsville <br /> • Lady Bird Lane Improvements,City of Burnsville <br /> • 12611 Street and Dupont Avenue,City of Burnsville <br /> • Minnehaha Creek Sanitary Sewer Lining,City of Edina <br /> LeadersAdditional Key <br /> Ro <br /> Eric will coordinate with survey crew chiefs to complete topographic survey in a timely manner as soon as authorization of this proposal is <br /> Eric Wilfahrt,L.S. received.He will coordinate with our survey drafters to implement field shots into an AutoCAD drawing for plan use.He will manage survey <br /> Survey Manager staking requests throughout construction.Eric has been involved with past projects for Arden Hills and is familiar with the community. <br /> Ir Tim Olson,P.E.,CFM Tim will evaluate options for storm sewer layouts as provided in the RFP and confirm the chosen layout will sufficiently address <br /> Water Resources neighborhood drainage concerns.He will work closelywith the Rice CreekWatershed District(RCWD)to determine what BMP measures <br /> Manager are needed to address their requirements.Tim has extensive experience with the RCWD including permitting,grant work,and contract <br /> work.He has worked with the RCWD in multiple communities and has personal contacts with the majority of their staff at nearly all levels. <br /> Mitch Hoeft,P.E. Mitch will provide his expertise in trenchless utility services to evaluate the existing sanitary sewer system and provide suggestions <br /> Trenchless Engineer for possible rehabilitation solutions.Mitch has been involved with projects for the city in the past and is familiar with the community. <br /> 1 <br /> {� Nicole Schmidt Nicole will customize a communication plan for the City of Arden Hills,help the project team with community outreach and <br /> Specialist <br /> Communication meetings as needed,and manage any project social media efforts. <br /> Our construction observer/inspector will provide on-site construction observation as needed and will coordinate with the city and <br /> Construction Observer/Inspector its residents during construction.The inspector will be an engineer-in-training,or someone with similar experience,and will be <br /> Engineer-in-Training knowledgeable in the field of street and utility construction.Nick Amatuccio will provide direct support to the inspector during <br /> construction so they can handle potential issues as a team. <br /> 2021 Hazelnut Park/Glenpaul Neighborhood Street and Utility Improvements I City of Arden Hills, Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.