Laserfiche WebLink
Arden Hills City Hall Mechanical Assessment 2020 <br /> Introduction <br /> The Arden Hills City Hall was built in 2000. The building is approximately 17,000 square feet with a <br /> partial basement and partial second floor. The main floor houses city offices and the council chambers. <br /> The upper floor has offices while the basement has a community room, storage and mechanical spaces. <br /> The scope of the project includes the building HVAC systems and Domestic Hot Water Heater. The <br /> following observations were made on June 12, 2020. <br /> Domestic Water Heating Systems <br /> The main building domestic hot water heater is a State model SBF7512ONE gas-fired tank-type <br /> commercial water heater located in the boiler room. The water heater appears to be original to the <br /> building. The water heater appeared to be in fair condition with some small amounts of rust forming. <br /> Based on the age,the water heater is near the end ffof its expected life and should be replaced. <br /> xorwn�aw, <br /> SLY <br /> 3 Page <br />