My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-24-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
08-24-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:21:32 AM
Creation date
9/8/2020 4:35:25 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arden Hills City Hall Mechanical Assessment 2020 <br /> Introduction <br /> The Arden Hills City Hall was built in 2000. The building is approximately 17,000 square feet with a <br /> partial basement and partial second floor. The main floor houses city offices and the council chambers. <br /> The upper floor has offices while the basement has a community room, storage and mechanical spaces. <br /> The scope of the project includes the building HVAC systems and Domestic Hot Water Heater. The <br /> following observations were made on June 12, 2020. <br /> Domestic Water Heating Systems <br /> The main building domestic hot water heater is a State model SBF7512ONE gas-fired tank-type <br /> commercial water heater located in the boiler room. The water heater appears to be original to the <br /> building. The water heater appeared to be in fair condition with some small amounts of rust forming. <br /> Based on the age,the water heater is near the end ffof its expected life and should be replaced. <br /> xorwn�aw, <br /> SLY <br /> 3 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.