My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-14-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/11/2020 1:09:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering, City Administration <br /> Legal Expenses (Section 19) escrow $1000.00 <br /> Engineering Fee (section 19) Escrow $2,800.00 <br /> Total Cash Requirements $3,800.00 <br /> The City is implementing a pass through billing process. The $3,800.00 escrow will be held and all bills <br /> will be forwarded for immediate payment. If payments are not made in a timely fashion,the project will <br /> stop until payments are made. If said fees are less than estimated,the City shall reimburse the Developer <br /> within thirty(30) days of receipt of final invoices. <br /> 31. RESPONSIBILITY FOR COSTS. <br /> A. Except as otherwise specified herein,the Developer shall pay all costs incurred by <br /> it or the City in conjunction with the development of the plat,including but not limited to Soil and Water <br /> Conservation District charges,legal,planning,engineering and inspection expenses incurred in connection <br /> with approval and acceptance of the plat,the preparation of this Agreement,review of construction plans <br /> and documents, and all costs and expenses incurred by the City in monitoring and inspecting development <br /> of the plat. <br /> B. The Developer shall reimburse the City for reasonable costs incurred in the <br /> enforcement of this Agreement,including engineering and attorneys'fees. <br /> C. The Developer shall pay,or cause to be paid when due,and in any event before <br /> any penalty is attached,all special assessments referred to in this Agreement. This is an obligation of the <br /> Developer and shall continue in full force and effect even if the Developer sells one or more lots,the entire <br /> plat or property,or any part of it. <br /> D. The Developer shall pay in full all bills submitted to it by the City for obligations <br /> incurred under this Agreement within thirty(30)days after receipt. If the bills are not paid on time,the City <br /> may halt plat development and construction until the bills are paid in full. Bills not paid within thirty(30) <br /> days shall accrue interest at the rate of eighteen percent(18%)per year. <br /> 12 <br /> 211449v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.