My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-14-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/11/2020 1:09:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION—JULY 20, 2020 5 <br /> Mr. Novazcyk mentioned that in some facilities they have play areas for grandchildren, and <br /> outdoor patios with fireplaces. <br /> Councilmember Scott said there was a significant old tree on site that he would like noted and <br /> preserved if possible. He thought the discussion occurred on a social site and he would try to find <br /> out where the tree is. <br /> Community Development Manager/City Planner Mrosla mentioned this proposal will require <br /> a public hearing at both the Planning Commission and City Council meetings. Also, they are <br /> intending to meet or exceed the architectural standards. <br /> Mayor Grant noted they would like to know the slope of the roof but generally 4 of 5 <br /> councilmembers are OK with 55 feet, 4 of 5 are OK with the number of units. <br /> Mr. Cozine said the architect responded that the peak of the roof will be 60 feet. <br /> Councilmember McClung clarified that the number of units would be OK with other additions <br /> to the PUD such as a trail. <br /> Community Development Manager/City Planner Mrosla said the next steps would be for the <br /> applicant to make a land use application with the City and submit plans for review, and make <br /> application with the water shed district for stormwater review. <br /> B. MnDOT Access Study for Snelling Avenue (Highway 51) Closure Update <br /> Ms. Simer noted that Council had asked for further opportunities for public input about the <br /> closure of Hamline Avenue at Snelling. They hosted an open house in May and collected <br /> comments before and after. <br /> Ms. Simer explained that MnDOT had closed the left turn from southbound Snelling Avenue to <br /> Hamline Avenue temporarily in 2019 as part of the mitigation strategy for the 1-35W MnPASS <br /> project, anticipating more traffic on Snelling Avenue. Signal timing was adjusted for left hand <br /> turns and U-turns at Lydia Avenue. The Cable Median Barrier Project was planned independently <br /> of the I-35W project as part of a state-wide initiative to prevent run off road crashes. Cable <br /> barriers are planned for Snelling Avenue. <br /> Ms. Simer continued that there were 5 crashed at the intersection of Snelling and Hamline from <br /> 2016-2018, one of which was a fatality. By closing the left turn lane, they anticipate traffic will <br /> reroute to intersections with traffic signals. Prior to the closure, vehicles were observed queuing <br /> beyond the left turn lane and into the through lane which creates a crash risk. Prior to the closure <br /> only about 8% of cars that turned left onto Hamline were headed to residences in adjacent <br /> neighborhoods. Analysis was done to see how the change was affecting Lydia Avenue. Travel <br /> time spiked initially, but trended down. Turning left at Lydia takes approximately five minutes <br /> longer than turning on Hamline Avenue. Emergency responders in the area were contacted to <br /> understand what impact they saw from the closure. They did not feel it would cause delays <br /> because they use routing software to respond to calls. <br />
The URL can be used to link to this page
Your browser does not support the video tag.