Laserfiche WebLink
1. INTRODUCTION <br /> 1.1 Authorization <br /> On April 27, 2020, the Arden Hills City Council adopted Resolution 2020-020 ordering the <br /> preparation of an engineering feasibility report for the 2021 Pavement Management Program <br /> (PMP). The resolution directs staff to study the need, cost-effectiveness and feasibility of <br /> potential infrastructure improvements within the 2021 PMP project area. <br /> 1.2 Project Scope <br /> This report investigates the feasibility of proposed street and utility improvements identified <br /> within the City of Arden Hills Capital Improvement Program titled the 2021 Pavement <br /> Management Program (2021 PMP). The proposed project was identified as a result of <br /> deteriorating street pavement conditions and potential improvements to water main, sanitary <br /> sewer and drainage infrastructure. Two areas are included within the scope of this study. <br /> Area 1 —Hazelnut Park Residential Neighborhood <br /> ■ Jerrold Avenue from New Brighton Road to approximately 825 feet west of Prior Avenue <br /> ■ Edgewater Avenue from New Brighton Road to approximately 980 feet west of Prior Avenue <br /> ■ Glenpaul Avenue from New Brighton Road to Cleveland Avenue <br /> ■ Prior Avenue from County Road D to 150 feet north of Jerrold Avenue <br /> Area 2—Lake Valentine Road <br /> ■ Lake Valentine Road from Snelling Avenue (CSAH 76)to Mounds View High School <br /> A map depicting the location of potential street and utility improvements is provided in <br /> Appendix A. <br /> This report includes specific recommendations regarding the scope of improvements, <br /> estimated project costs, funding sources, estimated assessments and a project delivery <br /> schedule. Improvements within this report include street reconstruction, water main <br /> replacement, sanitary sewer repairs and drainage improvements. <br /> 1.3 Available Data <br /> • City of Arden Hills 2040 Comprehensive Plan <br /> ■ City of Arden Hills Engineering Record Plans <br /> • Geotechnical Report, dated September 19, 2019 <br /> • Pavement Forensic Report dated May 6, 2020 <br /> • Pavement Condition Ratings within the project area <br /> • Sanitary Sewer CCTV Televising Inspections Data <br /> • Water Main break and leak history <br /> • GIS database for infrastructure conditions <br /> • Field observations of project area <br /> • City of Arden Hills Assessment Policy <br /> ■ Arden Hills Engineering Design Standards <br /> Feasibility Report Page 1 <br /> 2021 PAP Street and Utility Improvements <br /> City Project Number PW 21-0100 <br />