Laserfiche WebLink
2.3 Sanitary Sewer <br /> The existing sanitary sewer within the study area consists of vitrified clay pipe (VCP), <br /> polyvinyl chloride pipe (PVC) and reinforced concrete pipe (RCP) installed in the years <br /> summarized on the following Table 2. Sanitary sewers were inspected by the City Public <br /> Works Department using video televising equipment in the spring of 2020 and found to be <br /> in good condition. Sanitary sewer service connection points were also evaluated as part of <br /> the inspection process. Approximately 19 locations were identified as needing spot repairs <br /> were sewer services connect to the sewer main, as described in Section 3 of this report. A 6- <br /> inch diameter force main extends along Edgewater Avenue from Lift Station#1 to west limit <br /> of gravity sewer 330 feet west of Prior Avenue. The condition of this force main will be <br /> further evaluated during the design process. <br /> Table 2: Summary of Existing Sanitary Sewer Conditions <br /> Overall <br /> Pipe Pipe Year CIPP Lining Condition of <br /> Street Name Material Diameter Installed Lining Year Main Pipe <br /> Jerrold Ave (east) VCP 8-inch 1961 Yes 2013 Good <br /> Jerrold Ave (west) PVC 8-inch 1977 No Good <br /> Edgewater Ave VCP 8-inch 1960 Yes 2013 Good <br /> (east) <br /> Edgewater Ave PVC 8-inch 1977 No Good <br /> (west) <br /> Edgewater Ave CIP 6-inch 1960 No TBD <br /> (west) Forcemain <br /> Glenpaul Ave VCP 8-inch 1961 Yes 2013 Good <br /> Prior Ave RCP 21-inch 1961 No Fair <br /> Lake Valentine VCP 8-inch 1960 No Fair(root <br /> Road cutting) <br /> 2.4 Water Main <br /> The existing water distribution mains within the study area consists of cast iron pipe (CIP) <br /> and ductile iron pipe (DIP) as summarized on the following Table 3. A review of the City's <br /> water main break historical records did not identify any water main pipe break or leak repairs, <br /> other than isolated curb stop leaks located on the house side of the curb stops as noted below. <br /> Feasibility Report Page 3 <br /> 2021 PAP Street and Utility Improvements <br /> City Project Number PW 21-0100 <br />