Laserfiche WebLink
wsb <br /> September 19, 2019 <br /> Mr. Todd Blomstrom, PE <br /> Interim Public Works Director/City Engineer <br /> City of Arden Hills <br /> 1245 West Highway 96 <br /> Arden Hills, MN 55112 <br /> Re: Geotechnical Report <br /> 2020 PMP Street Improvements <br /> Arden Hills, Minnesota <br /> WSB Project No.: 014297-000 <br /> Dear Mr. Blomstrom: <br /> We have conducted a geotechnical subsurface exploration program for the above referenced <br /> project. This report contains our soil boring logs, an evaluation of the conditions encountered in <br /> the borings and our recommendations for subgrade preparation, underground utility installation, <br /> 0 <br /> and other geotechnical related design and construction considerations. <br /> U <br /> z If you have any questions concerning this report or our recommendations, or for construction <br /> m material testing for this project, please call us at (952) 737-4660. <br /> U) <br /> — Sincerely, <br /> O <br /> WSB <br /> M <br /> N ' <br /> N <br /> — Darin Hyatt, P Mark(Osborn, PE <br /> Senior Geotechnical Engineer Geotechnical Project Engineer <br /> (M <br /> N <br /> LO Attachment <br /> z Geotechnical Report <br /> w <br /> J <br /> J DEH/tw <br /> U) <br /> z <br /> m <br /> 0 <br /> J <br /> m <br /> } <br /> >Q <br /> W <br /> H <br /> Q <br /> O <br /> V <br /> N <br />