My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-14-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/11/2020 1:09:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. INTRODUCTION <br /> 1.1 Project Location <br /> The proposed 2020 PMP roadway and utility improvements will be along Glenpaul Avenue from <br /> Cleveland Avenue N. to New Brighton Road, Edgewater Avenue from New Brighton Road west to its cul- <br /> de-sac, Jerrold Avenue from New Brighton Road west to its cul-de-sac and North Prior Avenue from <br /> Jerrold Avenue to West County Road D in Arden Hills, Minnesota. <br /> Borings were completed through the existing pavement sections. The approximate boring locations can <br /> be found on the Soil Boring Exhibit in Appendix A. <br /> 1.2 Project Description <br /> It is proposed to reconstruct the existing surface along these alignments and complete curb and gutter <br /> repairs/installation and place a new watermain. After backfilling the utilities, new roadways will be <br /> constructed. The new roadways will be two lane bituminous roads, reconstructed to about the same <br /> horizontal and vertical alignments as the existing ones. <br /> Underground utilities will consist of watermain. This utility is expected to be placed within 8 feet of final <br /> grades. <br /> WSB has developed recommendations for this project in consideration of the proposed layout, loadings, <br /> and configurations as understood at this time. WSB must be made aware of the revised or additional <br /> information in order to evaluate the recommendations for continued applicability. <br /> 1.3 Purpose and Project Scope of Services <br /> Sue Polka, previous Interim City Engineer with the City of Arden Hills authorized this work. In order to <br /> assist the design team in preparing plans and specifications, we have developed recommendations for <br /> pavement and utility subgrade preparation and pavement thicknesses. As such, we have completed a <br /> subsurface exploration program and prepared a geotechnical report for the referenced site. This stated <br /> purpose was a significant factor in determining the scope and level of service provided. Should the <br /> purpose of the report change the report immediately ceases to be valid and use of it without WSB's prior <br /> review and written authorization shall be at the user's sole risk. <br /> Our authorized scope of work has been limited to: <br /> 1. Mobilization /Demobilization of a Truck Mounted Drill Rig. <br /> 2. Clearing underground utilities utilizing the Gopher State One Call. <br /> 3. Drilling 13 standard penetration test borings to a depth of about 10 feet each. <br /> 4. Sealing the borings per Minnesota Department of Health procedures. <br /> 5. Perform soil classification and analysis. <br /> 6. Review of readily available project information and geologic data. <br /> 7. Providing this geotechnical report containing: <br /> a. Summary of our findings. <br /> b. Discussion of subsurface soil and groundwater conditions and how they may affect the <br /> proposed pavements and utilities. <br /> c. Estimated R-value of the soils. <br /> d. A discussion of soils for use as structural fill and site fill. <br /> Geotechnical Report <br /> 2020 PMP Street Improvements <br /> Arden Hills,Minnesota <br /> WSB Project No.014297-000 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.