My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-14-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/11/2020 1:09:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8 Construction Safety <br /> All excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P "Excavations <br /> and Trenches". This document states that excavation safety is the responsibility of the contractor. <br /> Reference to this OSHA requirement should be included in the job specifications. <br /> The responsibility to provide safe working conditions on this site, for earthwork, building construction, or <br /> any associated operations is solely that of the contractor. This responsibility is not borne in any manner <br /> by WSB. <br /> 4.9 Cold Weather Construction <br /> It is our understanding that construction is unlikely to occur during the winter months. However, if the <br /> construction does continue into the winter months we recommend the following guidelines. <br /> Only unfrozen fill should be used. Placement of fill must not be permitted on frozen soil. <br /> 4.10 Field Observation and Testing <br /> The soil conditions illustrated on the Logs of Test Borings in AppendixA are indicative of the conditions <br /> only at the boring locations. For this reason, we recommend that all excavations at this site be observed <br /> by a geotechnical engineer or technician prior to fill or backfill placement or construction of any structural <br /> elements to determine if the soils are capable of supporting the fill backfill and/or structural loads. These <br /> observations are necessary to judge if all unsuitable materials have been removed from within the <br /> planned construction area and an appropriate degree of lateral oversize has been provided. <br /> WSB also recommends a representative number of field density tests be taken in all engineered fill and <br /> backfill placed to aid in judging its suitability. Fill placement and compaction should be monitored and <br /> tested to determine that the resulting fill and backfill conforms to specified density, strength or <br /> compressibility requirements. Prior to use, any proposed fill and backfill material should be submitted to <br /> the WSB laboratory for testing to verify compliance with recommendations and project specifications. <br /> Dynamic Cone Penetrometer(DCP)tests can be completed in the aggregate base in lieu of density <br /> testing. We recommend following MnDOT Specification 2211.3.D.2.c. <br /> WSB would be pleased to provide the necessary field observation, monitoring and testing services during <br /> construction. <br /> 4.11 Plan Review and Remarks <br /> The observations, recommendations and conclusions described in this report are based primarily on <br /> information provided to WSB, obtained from our subsurface exploration, our experience, several <br /> necessary assumptions and the scope of service developed for this project and are for the sole use of our <br /> client. We recommend that WSB be retained to perform a review of final design drawing and <br /> specifications to evaluate that the geotechnical engineering report has not been misinterpreted. Should <br /> there be any changes in the design or location of the structures related to this project or if there are any <br /> uncertainties in the report we should be notified. We would be pleased to review any project changes <br /> and modify the recommendations in this report (if necessary) or provide any clarification in writing. <br /> The entire report should be kept together; for example, boring logs should not be removed and placed in <br /> the specifications separately. <br /> The boring logs and related information included in this report are indicators of the subsurface conditions <br /> only at the specific locations indicated on the Soil Boring Exhibit and times noted on the Logs of Test <br /> Boring sheets in AppendixA. The subsurface conditions, including groundwater levels, at other <br /> locations on the site may differ significantly from conditions that existed at the time of sampling and at the <br /> boring locations. <br /> Geotechnical Report <br /> 2020 PMP Street Improvements <br /> Arden Hills,Minnesota <br /> WSB Project No.014297-000 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.