Laserfiche WebLink
LOG OF TEST BORING ws b <br /> PROJECT NAME: 2020 PMP/Arden OaksNarious PL PROJECT LOCATION: Arden Hills,MN BORING NUMBER PB-8 <br /> CLIENT/WSB#: 014297-000 PAGE 1 OF 1 <br /> DEPTH o SA PLE N-Value Plot <br /> DESCRIPTION OF MATERIAL USCS GEOLOGIC .a g� N w <br /> (ft) ORIGIN _Q YP No. <br /> 0 7,5 15 <br /> x x 3 1/2"BITUMINOUS over 4"AGGREGATE BASE Pavement Section <br /> x <br /> x <br /> x <br /> x <br /> LEAN CLAY,mixed with sand,brown,moist CL Fill <br /> 1 HSA 1 <br /> 2 <br /> SB 2 4 a <br /> 3 <br /> 4 HSA <br /> a <br /> c� <br /> J <br /> U 5- <br /> SAND WITH SILT,fine grained,brown,moist SP-SM <br /> O SB 3 11 ai <br /> Y <br /> O 6 <br /> 0 <br /> tY <br /> a HSA <br /> a <br /> O <br /> 0 7 <br /> z <br /> c� <br /> x <br /> U <br /> F <br /> W SB 4 9 :9 <br /> F 8 <br /> U <br /> W <br /> O <br /> 0 <br /> 0 9 HSA <br /> N <br /> V <br /> O_ <br /> Y <br /> r <br /> O 10 SAND,fine grained,brown,moist,loose SP Lacustrine <br /> SB 5 7 <br /> 0 <br /> c� <br /> m <br /> 11 <br /> End of Boring 11.0 ft. <br /> o WATER LEVEL MEASUREMENTS START: 6/20/2019 END: 6/20/2019 <br /> a <br /> z SAMPLED CASING CAVE-IN WATER WATER Crew Chief: Logged By: <br /> U DATE TIME DEPTH DEPTH DEPTH DEPTH ELEVATION METHOD R.Kurth DEH <br /> i 6/20/2019 11 9.5 7 None 3 1/4"HSA 0'-9.5' Notes: <br /> U <br /> W <br /> F <br /> O <br /> W <br /> c3 <br />