My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-14-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:13:53 AM
Creation date
9/11/2020 1:09:05 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-zSRQEN HILLS <br /> May 5, 2020 <br /> Subj ect: 2021 Pavement Management Program <br /> Dear Property Owner: <br /> On April 27, 2020, the Arden Hills City Council authorized a feasibility study for potential street <br /> and utility improvements in your neighborhood. The project is being considered for the 2021 <br /> construction season. The study area includes Prior, Glenpaul, Edgewater and Jerrold Avenue as <br /> well as the eastern portion of Lake Valentine Road as shown on the attached map. <br /> The feasibility study will evaluate the extent and costs for replacement or repairs to street <br /> pavement, water main, sanitary sewers and stormwater drainage infrastructure. During this <br /> evaluation process, City staff requests that residents within the study area complete the enclosed <br /> survey form to assist with determining needed improvements within your neighborhood. <br /> Residents within the project area are encouraged to visit the City's website to review additional <br /> study information as described on the back of this page. Due to challenges related to COVID-19, <br /> staff will be posting a recorded presentation describing project details by May 18, 2020 in lieu of <br /> holding a public open house meeting. Residents can contact city engineering staff by email or <br /> phone with any questions or comments related to potential street and utility improvements. <br /> After completing the feasibility report, staff will mail you additional information describing the <br /> schedule and future steps for recommended improvements within the 2021 Pavement <br /> Management Program project area. <br /> The City of Arden Hills would like to thank you in advance for your patience and cooperation <br /> with this process. Please complete and return the enclosed survey form by June 3, 2020. If you <br /> have any questions or comments, please contact David Swearingen at 651-792-7847 or email <br /> dswearingen@cityofardenhills.org. <br /> Sincerely, <br /> CITY OF ARDEN HILLS <br /> Todd Blomstrom, P.E. <br /> Public Works Director/City Engineer <br /> City of Arden Hills <br /> 1245 West Highway 96 • Arden Hills Minnesota 55112 <br /> Phone 651.634.5120 •Fax 651.634.5137 <br /> www.ci.arden-hills.rnn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.