My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-28-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 4:10:49 PM
Creation date
9/24/2020 4:06:33 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan F – Site Plan (C6), dated 05/08/19 <br />Plan G – Restoration and Paving Plan (C8), dated 01/14/19 <br /> Plan H - Tree Survey and Preservation Plan (PP-7 and PP-8), dated 02/25/15 <br /> Plan I - Landscape Plan (L1) dated 05/08/19 <br /> Plan J - Demolition Plan (D1) dated 05/08/19 <br />Plan K – Floor Plans (A2, A4 - S4) dated 05/08/19 <br />Plan L – Building Elevations (A3) dated 12/11/19 <br /> <br /> 7. PERMITS. The Developer shall obtain or require its contractors and subcontractors to <br />obtain all necessary permits, including but not limited to: <br />• Ramsey County for County Road Access and Work in County Rights-of-Way <br />• City of Arden Hills for Building Permits, Sewer and Water, , Grading and Erosion <br />Control Permit <br />• Rice Creek Watershed District for erosion control permit and storm water <br />management permit <br /> <br /> 8. LICENSE. The Developer hereby grants the City, its agents, employees, officers and <br />contractors a license to enter the subject property to perform all work and inspections deemed appropriate by <br />the City in conjunction with plat development. <br /> <br /> 9. EROSION CONTROL. The plat shall be graded in accordance with the approved <br />grading development and erosion control plan. The plan shall conform to City of Arden Hills specifications. <br />Within thirty (30) days after completion of the grading and before the City approves individual building <br />permits the Developer shall provide the City with an "as constructed" grading plan certified by a registered <br />land surveyor or engineer that all ponds, swales, and ditches for public drainage have been constructed on <br />public easements or land owned by the City. Notwithstanding the foregoing, the City may issue building <br />permits to the Developer, prior to completion of all grading, provided the City Engineer has determined that <br />adequate erosion control measures are in place. The "as constructed" plan shall include field verified <br />elevations of the following: a) cross sections of ponds; b) location and elevations along all swales, wetlands, <br />wetland mitigation areas if any, ditches, locations and dimensions of borrow areas/stockpiles, and installed <br />"conservation area" posts; and c) lot corner elevations. The City will withhold issuance of building permits <br />until the approved certified grading plan is on file with the City and all erosion control measures are in place <br />as determined by the City Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.