My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
09-28-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 4:10:49 PM
Creation date
9/24/2020 4:06:33 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The project shall be completed in accordance with the plans submitted and as amended by theconditions of approval. Any significant changes to the plans, as determined by the City Planner,shall require review and approval by the City Council.2. The Preliminary Plat approval shall expire six months from the date of the City Council approvalunless the Final Plat has recorded with Ramsey County or a time extension granted by the CityCouncil.3. The Applicant shall record the Final Plat with Ramsey County and a copy shall be provided to theCity within sixty (90) days of theCity’sapproval.4. The Applicant shall be financially responsible for all applicable water and sanitary charges. Ratesapplied shall be those in effect at the time of Final Plat approval and shall be memorialized in theDevelopment Agreement.5. A Development Agreement shall be prepared by the City Attorney and subject to City Councilapproval. The Development Agreement shall be fully executed prior to release of a building permit.6. The Applicant shall submit a park dedication fee that shall be seven and a half (7.5) percent of thefair market value of the unimproved land and subject to the approval of the City Council. The parkdedication fee shall be submitted prior to the release of the Final Plat.7. Survey monuments shall be placed and installed at all block corners, angle points, points of curvesin streets, and at intermediate points as shown on the Final Plat. Pipes or steel rods shall be placedat the corners of each lot.8. The final plat shall provide dedication of a 60-ft wide right of way for Gateway Boulevard on Lot2, Block 1 overlying the area currently encumbered by existing drainage and utility easement.9. Prior to the issuance of a grading and erosion permit, planning staff shall approve in writing thefinal landscaping plan.10.Prior to the issuance of a grading and erosion permit, engineering staff shall approve in writing thefinal location of the loading driveway access to align with adjacent commercial driveway orprovide adequate offset distance.Conditions of Approval
The URL can be used to link to this page
Your browser does not support the video tag.