Laserfiche WebLink
Development of the Risk and Resilience Assessment <br />Arden Hills, MN <br /> <br /> <br /> <br /> <br /> <br /> 5 <br /> <br />Sylwia Kokoszka, EI, CFM - Engineer <br />EXPERIENCE <br />4 Years <br /> <br />EDUCATION <br />BS, Civil Engineering, University of Illinois - 2016 <br /> <br />REGISTRATION / LICENSE <br />Engineer Intern, IL, 061- 039050 <br />Certified Floodplain Manager, IL, 17-00782 <br />Sylwia’s experience includes analysis and design of stormwater systems, wastewater collection and <br />treatment systems, and potable water treatment systems. Sylwia has been involved in planning, <br />permitting, design, and construction. Agencies Sylwia has worked with for permitting include, IDNR, <br />Kane/DuPage, McHenry/Lake, and Will County SWCD, IEPA, and USACOE (Chicago District). <br />Examples of stormwater experience include hydrologic and hydraulic modeling, drainage studies, <br />stream restoration projects, engineer’s estimates of probable costs, storm sewer design, ditch <br />design, existing drainage plans (EDP), proposed drainage plans (PDP) and construction <br />observation. Examples of wastewater experience include plan reviews, specification write -ups, <br />hydraulic profile calculation, and vendor coordination. Examples of potable water experience <br />include permitting, specification write-ups,treatment plant operational evaluation and design for <br />repair of existing treatment systems. Sylwia is proficient with ArcMap, HEC-HMS, XP SWMM, <br />HEC -RAS, GeoHECRAS, HY-8, and Microstation <br /> <br />SELECTED PROJECT EXPERIENCE <br />Risk & Resilience Assessment and Emergency Response Plans Updates - Central Lake County Joint <br />Action Water Agency / Staff Engineer <br />HR Green is assisting Central Lake County Joint Action Water Agency (CLCJAWA) to conduct a <br />Risk and Resilience Assessment (RRA) and prepare an Emergency Response Plan (ERP). A large <br />portion of this project is associated with the facilitation of meetings in which all stakeholders discuss <br />and agree upon such matters as the mission of the CLCJAWA’s water system, the critical assets of <br />the system, the threats against which it must be protected, the consequences that would result from <br />the loss of certain critical assets and the effectiveness of existing security measures where they <br />exist. <br />Sylwia completed a Risk & Resilience Assessment for CLCJAWA to meet the new EPA <br />requirements. She completed field visits at the site to determine the potential plant vulnerabilities <br />for malevolent acts and natural disasters. <br />Water Treatment Plant Risk and Resilience Assessment - City of Waukegan, IL / Project Manager <br />HR Green is currently working on completing the Risk and Resilience Assessment <br />(RRA) for the Waukegan WTP’s facilities. The project includes a site assessment of all WTP facilities for <br />existing security and countermeasures against malevolent acts and natural hazards. The RRA includes <br />assessment of critical system assets for the most likely threat categories, determination of vulnerability <br />likelihood, and quantification <br />of economic consequences and public health impacts resulting from asset damage. The final report <br />will identify the Waukegan WTP’s highest risk areas and will provide recommendations to improve <br />resiliency. <br />Sylwia is currently assisting with the assessment of the Waukegan Water Treatment Plant