Laserfiche WebLink
ARDEN HILLS PLANNING COMMISSION – September 9, 2020 10 <br /> <br />20. All fencing and retaining wall materials shall be complementary to the building materials <br />and shall be approved in writing by the Planning Division prior to issuance of a building <br />permit. Retaining walls greater than four (4) feet in height shall be engineered and <br />detailed calculations shall be submitted to the City. <br />21. Prior to City Council consideration, the Applicant shall submit a materials board to be <br />approved in writing by staff. <br />22. A Grading and Erosion permit shall be obtained from the City’s Engineering Department <br />prior to commencing any grading, land disturbance or utility activities. The Developer <br />shall be responsible for obtaining any permits necessary from other agencies, including <br />but not limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT <br />prior to the start of any site activities. <br />23. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />24. Prior to the issuance of the Grading and Erosion permit, the Engineering Department <br />shall review and approve final grading and utility plans in writing. Plans shall be <br />amended to include detail drawings for connection to the sanitary sewer system in <br />Gateway Boulevard, restoration of utility cuts within public streets, and inclusion of City <br />details 3401, 3402, 3408, and 4000. <br />25. Any future trash enclosures shall utilize wooden gates and be constructed on three sides <br />using the same materials and patterns used on the building. Locations shall be approved <br />by the Planning Department. <br />26. The Applicant shall provide an executed copy of the City’s standard stormwater <br />maintenance and easement agreement prior to approval of the Development Agreement. <br />27. All disturbed boulevards shall be restored with sod. <br />28. All areas of the site, where practical, shall be sodded or seeded and maintained. The <br />property owner shall mow and maintain all site boulevards to the curb line of the public <br />streets. <br />29. Overnight trailer parking is prohibited onsite other than along the dock wall within the <br />concrete dock apron. <br />30. The Applicant shall work with Ramsey County to add five (5) seconds to the signal <br />timing for Round Lake Road and Hwy 96 to allow for more northbound left turns during <br />the PM peak hour prior to the issuance of a certificate of occupancy. <br />31. Warehousing and wholesaling shall not exceed 85 percent of the floor area tenant. The <br />remaining 15 percent of floor area shall be non-warehouse uses such as a combination of <br />uses including-but-not-limited-to office, manufacturing, production, research and <br />development, lab and/or showroom per tenant. <br /> <br />Community Development Manager/City Planner Mrosla reviewed the options available to <br />the Planning Commission on this matter: <br /> <br />1. Recommend Approval with Conditions <br />2. Recommend Approval as Submitted <br />3. Recommend Denial <br />4. Table