Laserfiche WebLink
7550 MERIDIAN CIR N, SUITE 120 | MAPLE GROVE, MN 55369 PAGE 3 OF 8 <br />DETERMINATION OF PROJECT BENEFIT <br />Benefits derived from the proposed project generally take two primary forms: 1) added value to the <br />property due to the elimination of encumbrances and/or the viability of different uses; <br />1 and 2) the <br />avoidance of future costs to maintain existing stormwater management features. The following <br />sections describe and quantify benefits associated with both of those categories and identify the <br />entities most closely aligned with receiving the benefits. Determination of future cost avoidance <br />include both one-time costs (for example, a major drainage system repair) and long-term costs over a <br />100-year life cycle (as a comparison to the life cycle of the proposed project).2 <br />DRAINAGE SYSTEM REPAIR AND LONG-TERM MAINTENANCE COST AVOIDANCE <br />The RCD 4 open channel between County Road C and Terrace Drive is in a state of disrepair that <br />cannot feasibly be corrected via annual minor maintenance. The draft RCWD Watershed <br />Management Plan envisions a system-wide repair of the RCD 4 open channel, including this project <br />location. This work will no longer be necessary in the project corridor if the proposed stormsewer <br />piping project proceeds.Table 2 displays anticipated costs for repairing the RCD 4 open channel <br />between County Road C and Terrace Drive, if the proposed project to replace the open channel with <br />pipe is not completed. <br />Per RCWD policy, the cost of major drainage system repair is allocated to the landowners who drain <br />to the system. For RCD 4, these landowners constitute the RCD 4 Water Management District (RCD <br />4-WMD). Therefore, RCD 4-WMD benefits the most from avoiding major repairs. <br />1 Added value to properties are primarily estimated using land values available through parcel data published by <br />Ramsey County. No appraisal work was completed to estimate these values. <br />2 All costs provided herein are in present-day (2020) dollars. No inflationary costs are included.