My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-19-2020-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
10-19-2020-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 2:41:41 PM
Creation date
10/15/2020 2:40:05 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7550 MERIDIAN CIR N, SUITE 120 | MAPLE GROVE, MN 55369 PAGE 1 OF 8 <br />Technical Memorandum <br />To:Nick Tomczik, District Administrator <br />Rice Creek Watershed District <br />From:Joseph A Lewis, PE <br />Houston Engineering, Inc. <br />Through:Chris Otterness, PE <br />Subject:RCD 4 Water Management Project <br />Phase 3 – Benefit and Cost Apportionment <br />Date:January 31, 2020 <br />Project:5555-0285 <br />INTRODUCTION <br />The purpose of this memo is to quantify the benefits and costs of a proposed water management <br />project that includes replacing approximately 2,500 feet of Ramsey County Ditch (RCD) 4 open <br />channel between County Road C and Terrace Drive with stormsewer piping. The proposed project <br />may provide benefits to several specific entities, including: <br />x the Rice Creek Watershed District (RCWD), <br />x the City of Roseville (City), <br />x landowners adjacent to the project, and <br />x landowners draining to the RCD 4 public drainage system. <br />The benefits of replacing the ditch with a pipe include: <br />x reduced repair and maintenance costs associated with the open channel; <br />x water quality improvements such as the reduction in downstream sediment delivery and <br />subsequent reduction in maintenance at a District facility (Oasis Pond); <br />x increasing land area available for higher value land uses; and <br />x upstream floodplain reduction. <br />This memo includes an analysis for both initial construction and life cycle costs as well as benefits of <br />the project. The total and relative benefits for each benefitting entity determined within this <br />memorandum may be used by the RCWD and City to inform decisions regarding the allocation of <br />project costs should they proceed with the project. This memorandum also includes a potential <br />timeline for completing the project work. <br /> Attachment C
The URL can be used to link to this page
Your browser does not support the video tag.