Laserfiche WebLink
21. Prior to City Council consideration, the Applicant shall submit a materials board to be approved in writingbystaff.22.A Grading and Erosion permit shall be obtained from the City’s Engineering Department prior to commencingany grading, land disturbance or utility activities. The Developer shall be responsible for obtaining any permitsnecessary from other agencies, including but not limited to, MPCA, Rice Creek Watershed District,andRamsey County, MNDOT prior to the start of any site activities.23.The Applicant shall be responsible for protecting the proposed on-site storm sewer infrastructure andcomponents and any existing storm sewer from exposure to any and all stormwater runoff, sediments anddebris during all construction activities. Temporary stormwater facilities shall be installed to protectthequality aspect of the proposed and existing stormwater facilities prior to and during construction activities.Maintenance of any and all temporary stormwater facilities shall be the responsibility of theApplicant.24.Prior to the issuance of the Grading and Erosion permit, the Engineering Department shall review and approvefinal grading and utility plans in writing. Plans shall be amended to include detail drawings for connection tothe sanitary sewer system in Gateway Boulevard, restoration of utility cuts within public streets, and inclusionof City details 3401, 3402, 3408, and4000.25.Any future trash enclosures shall utilize wooden gates and be constructed on three sides using the samematerials and patterns used on the building. Locations shall be approved by the Planning Department.26.The Applicant shall provide an executed copy of the City’s standard stormwater maintenance and easementagreement prior to approval of the Development Agreement.27.All disturbed boulevards shall be restored with sod.28.All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shallmow and maintain all site boulevards to the curb line of the public streets.29.Overnight trailer parking is prohibited onsite other than along the dock wall within the concrete dock apron.30.The Applicant shall work with Ramsey County to add five (5) seconds to the signal timing for Round LakeRoad and Hwy 96 to allow for more northbound left turns during the PM peak hour prior to the issuance of acertificate ofoccupancy.31.Warehousing and wholesaling shall not exceed 85 percent of the floor area tenant. The remaining 15 percent offloor area shall be non-warehouse uses such as a combination of uses including-but-not-limited-to office,manufacturing, production, research and development, lab and/or showroom per tenant.