My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
10-12-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 2:43:35 PM
Creation date
10/15/2020 2:42:31 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills <br />City Council Meeting for September 28, 2020 <br />P:\Planning\Planning Cases\2020\20-010 4200 Round Lake Road PP PUD\CC Packets <br />Page 8 of 9 <br />18. Prior to the issuance of a building permit, a landscape financial security of $50,000.00 <br />dollars shall be submitted. Landscape financial security is held for two full growing <br />seasons. <br />19. All rooftop or ground mounted mechanical equipment shall be hidden from view with <br />the same materials used on the building in accordance with City Code requirements. <br />20. All fencing and retaining wall materials shall be complementary to the building <br />materials and shall be approved in writing by the Planning Division prior to issuance <br />of a building permit. Retaining walls greater than four (4) feet in height shall be <br />engineered and detailed calculations shall be submitted to the City. <br />21. Prior to City Council consideration, the Applicant shall submit a materials board to be <br />approved in writing by staff. <br />22. A Grading and Erosion permit shall be obtained from the City’s Engineering <br />Department prior to commencing any grading, land disturbance or utility activities. The <br />Developer shall be responsible for obtaining any permits necessary from other <br />agencies, including but not limited to, MPCA, Rice Creek Watershed District, and <br />Ramsey County, MNDOT prior to the start of any site activities. <br />23. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and <br />all stormwater runoff, sediments and debris during all construction activities. <br />Temporary stormwater facilities shall be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />24. Prior to the issuance of the Grading and Erosion permit, the Engineering Department <br />shall review and approve final grading and utility plans in writing. Plans shall be <br />amended to include detail drawings for connection to the sanitary sewer system in <br />Gateway Boulevard, restoration of utility cuts within public streets, and inclusion of <br />City details 3401, 3402, 3408, and 4000. <br />25. Any future trash enclosures shall utilize wooden gates and be constructed on three sides <br />using the same materials and patterns used on the building. Locations shall be approved <br />by the Planning Department. <br />26. The Applicant shall provide an executed copy of the City’s standard stormwater <br />maintenance and easement agreement prior to approval of the Development <br />Agreement. <br />27. All disturbed boulevards shall be restored with sod. <br />28. All areas of the site, where practical, shall be sodded or seeded and maintained. The <br />property owner shall mow and maintain all site boulevards to the curb line of the public <br />streets. <br />29. Overnight trailer parking is prohibited onsite other than along the dock wall within the <br />concrete dock apron. <br />30. The Applicant shall work with Ramsey County to add five (5) seconds to the signal <br />timing for Round Lake Road and Hwy 96 to allow for more northbound left turns <br />during the PM peak hour prior to the issuance of a certificate of occupancy. <br />31. Warehousing and wholesaling shall not exceed 85 percent of the floor area tenant. The <br />remaining 15 percent of floor area shall be non-warehouse uses such as a combination <br />of uses including-but-not-limited-to office, manufacturing, production, research and <br />development, lab and/or showroom per tenant.
The URL can be used to link to this page
Your browser does not support the video tag.