My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-26-2020-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2020
>
10-26-2020-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 12:37:18 PM
Creation date
10/22/2020 12:35:13 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL – SEPTEMBER 28, 2020 8 <br /> <br />7. Survey monuments shall be placed and installed at all block corners, angle points, points <br />of curves in streets, and at intermediate points as shown on the Final Plat. Pipes or steel <br />rods shall be placed at the corners of each lot. <br />8. The final plat shall provide dedication of a 60-ft wide right of way for Gateway Boulevard <br />on Lot 2, Block 1 overlying the area currently encumbered by existing drainage and utility <br />easement. <br />9. Prior to the issuance of a grading and erosion permit, planning staff shall approve in <br />writing the final landscaping plan. <br />10. Prior to the issuance of a grading and erosion permit, engineering staff shall approve in <br />writing the final location of the loading driveway access to align with adjacent commercial <br />driveway or provide adequate offset distance. <br />11. A cross easement access and maintenance agreement for the proposed share access on Lot <br />2 shall be submitted and memorialized in the Development Agreement. <br />12. Site Plan approval shall be required for the construction of the proof of parking area. <br />13. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. Other than wash or architectural lighting, attached security lighting shall be <br />shoebox style, downward directed with flush lenses. If complaints are received the lighting <br />adjacent to residential uses shall utilize house shields as directed by the City. In addition, <br />any lighting under canopies (building entries) shall be recessed and use a flush lens. <br />14. A right of way permit shall be required for work performed within the City right of way. <br />15. A grading as-built and utility as-built plan shall be provided to the City upon completion <br />of grading and utility work. <br />16. No exterior storage shall be permitted. <br />17. This approval does not include signs. A separate sign permit is required for all proposed <br />signage. All signage shall meet the requirements of Sign District 6. <br />18. Prior to the issuance of a building permit, a landscape financial security of $50,000.00 <br />dollars shall be submitted. Landscape financial security is held for two full growing <br />seasons. <br />19. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />20. All fencing and retaining wall materials shall be complementary to the building materials <br />and shall be approved in writing by the Planning Division prior to issuance of a building <br />permit. Retaining walls greater than four (4) feet in height shall be engineered and detailed <br />calculations shall be submitted to the City. <br />21. Prior to City Council consideration, the Applicant shall submit a materials board to be <br />approved in writing by staff. <br />22. A Grading and Erosion permit shall be obtained from the City’s Engineering Department <br />prior to commencing any grading, land disturbance or utility activities. The Developer <br />shall be responsible for obtaining any permits necessary from other agencies, including but <br />not limited to, MPCA, Rice Creek Watershed District, and Ramsey County, MNDOT prior <br />to the start of any site activities. <br />23. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and
The URL can be used to link to this page
Your browser does not support the video tag.